Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T06CM06162
Review Name: REVISION - - 1ST
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/30/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide calculations to show that the PEX tubing is correctly sized for the proposed loads, i.e. the water velocity will not exceed 8 fps and the pressure drop will not exceed your calculated 9.3 psi/ 100 feet. 2. Provide a vacuum relief valve for the storage water heater. Reference: Section 608.7, UPC 2003. 3. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Sections 310.0 and 314.5, UPC 2003 |