Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T06CM06134
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/03/2007 | GERRY KOZIOL | WWM | REVIEW | Approved | |
12/04/2006 | DAVE MANN | FIRE | REVIEW | Approved | |
12/04/2006 | SUE REEVES | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
12/20/2006 | ROBERT SHERRY | WATER | REVIEW | Approved | |
12/20/2006 | WILLDAN | ADA | REVIEW | Denied | see 2nd party folder |
12/20/2006 | WILDAN | 2ND PARTY REVIEW | REVIEW | Denied | December 20, 2006 City of Tucson Development Services 201 N. Stone Avenue Tucson, AZ 85701 RE: UDALL PARK ADA MODIFICATIONS – 1ST REVIEW CITY OF TUCSON LOG NO. T06CM06006, T06CM06134 WILLDAN PROJECT NO. 13881-6089 The initial review for the above project has been completed. This letter contains comments which need to be addressed by written responses to each which indicate any actions taken. In order to facilitate a shorter second review, all corrections and revisions must be made on the original plans and two complete new sets of prints, along with one complete redlined set, must be returned to our office. To avoid delays, ensure that all corrections have been made, are complete, and have been coordinated on all applicable detail and note sheets, and that all changes have been highlighted with appropriate revision numbers, revision dates, and “cloud bubbles.” Pen or pencil corrections on final prints are not acceptable. This project has been reviewed for conformance with the 2003 IBC, 1997 UAC, 2003 IMC, 2003 IECC, 2002 NEC codes with local modifications, and the 2003 UPC with State of Arizona Amendments. Any revisions to this plan will require an additional review and approval by Willdan. Should you have questions regarding the comments herein, please contact your plans examiner Chris Kiel. Occupancy Occup. Load Construction Area S.F. Sprinklered Alarms N/A N/A N/A N/A N/A N/A Special Inspection is required for the following items: N/A The following items are acceptable for deferred submittals: N/A GENERAL COMMENTS: General Please provide additional dimensions in order to verify compliance with the applicable sections of ANSI 117.1-2003, ADAAG, and 2003 IBC per section 106.1.1 of the 2003 IBC (i.e. hallway dimensions, dimensions inside and outside of the water closet compartments, maneuvering clearances for fixtures and doors, etc.). In addition, please indicate if the existing doors have automatic door openers if they do not provide the required maneuvering clearances. Please provide additional information regarding the lavatories and drinking fountains in order to verify compliance with sections 602 and 606 of ANSI 117.1-2003. ARCHITECTURAL COMMENTS: Sheet A0.0 Please revise the plumbing code in the summary of government regulations to specify the 2003 UPC as adopted by the City of Tucson. Sheet A0.6 Please revise the bench back support to denote compliance with section 901 of ANSI 117.1-2003 (i.e. 2” maximum to a point 18” minimum above the seat surface). Sheet A2.2 Please revise the denoted scale to match the plans per section 106.1.1 of the 2003 IBC. Sheet A3.1 Please provide verification that the women’s water closets provide the minimum clearances per section 408.6 of the 2003 UPC (minimum 30” clearance, etc.). Sheet A4.1 Please provide verification that the elimination of the water closets and urinals does not reduce the number below the required minimums per table 2902.1 of the 2003 IBC. In addition, please provide verification that the removal of water closets in the men’s room does not adversely effect the water closet to urinal ratio per table 2902.1 of the 2003 IBC (section 419.2 of the 2003 IPC 1:2). Please provide the minimum maneuvering clearance for the pull side of the door to the women’s accessible water closet per section 404.2.3 of ANSI 117.1-2003. Sheet A7.1 Please provide additional information regarding the installation of the 2-hour separation per section 106.1.1 of the 2003 IBC. STRUCTURAL COMMENTS: Reviewed and accepted. PLUMBING COMMENTS: Reviewed and accepted. MECHANICAL COMMENTS: Reviewed and accepted. ELECTRICAL COMMENTS: Reviewed and accepted. ENERGY CODE COMMENTS: Reviewed and accepted. ACCESSIBILITY COMMENTS: Please refer to the General and Architectural Comments for issues concerning accessibility. Sincerely, WILLDAN Martin Haeberle, C.B.O. Building Official MAH/tb |
12/21/2006 | DAVID RIVERA | ZONING | REVIEW | Approved | |
12/26/2006 | MATT FLICK | ENGINEERING | REVIEW | Passed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/12/2007 | GERARDO BONILLA | OUT TO CUSTOMER | Completed |
01/12/2007 | SUE REEVES | REJECT SHELF | Completed |