Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T06CM06118
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/30/2006 | ANDREW CONNOR | ZONING | REVIEW | Approv-Cond | zoning inspection required to ensure parking lot re-striping per 1977 site plan. |
11/30/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
11/30/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved | T06CM06118 11/30/06 1. Enter electrical load on panel schedule for Ckt 16B. 2. Enter electrical load on panel schedule for Ckt 15B. 3. Electrical load on Ckt 13B appears to be 2700VA, not 900. 4. Electrical load on Ckt 13B appears to be 22.5A, which would overload a 20A Ckt. 5. If AC-1 load totals 77.5A, the VA would be 9300VA per phase, not 6210. Note that a 77.5A load would not be carried on a 50A Ckt. 6. Panel AC-2 load of 27A would not be protected by a 90A Breaker. 7. Load on Ckt B-20 appears to be 331VA, not 256. 8. Load on Ckt B-22 appears to be 556VA, not 492. Rework all feeder load calculations. |
11/30/2006 | ROBERT SHERRY | WATER | REVIEW | Approved | |
11/30/2006 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Approved | |
11/30/2006 | RSHERRY1 | WWM | REVIEW | Approved | |
11/30/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
11/30/2006 | PATRICIA GILBERT | ENGINEERING | REVIEW | Approved | |
11/30/2006 | DAVE MANN | FIRE | REVIEW | Approved | |
12/01/2006 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed |