Permit Number: T06CM06047
Parcel: 113010500

Review Status: Completed

Review Details: COMMERCIAL NEW

Permit Number - T06CM06047
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/14/2007 DAVE MANN FIRE REVIEW Denied On site fire hydrant required per C.O.T. amendments to the 2003 IFC (Section 508). Fire sprinklers will be accepted as an alternative.
02/20/2007 BETSY COTTLE COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed impact fees do apply, no development/site plan approved within the deadline
$3,933.01, central district, 2135 sf
02/25/2007 GERRY KOZIOL WWM REVIEW Approved
02/27/2007 MATT FLICK ENGINEERING REVIEW Approv-Cond A floodplain use permit is required.
03/02/2007 ROBERT SHERRY WATER REVIEW Approved
03/02/2007 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Approved
03/02/2007 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Correct the ventilation calculations for FC-1 (zone population). Reference ASHRAE Standard 62.1-2004.
2. Provide data to show that the air distribution effectiveness (Ez) is equal to 1.0 (Table 6-2; 150 fpm supply air jet reaches to within 4.5 feet of the floor). Reference ASHRAE Standard 62.1-2004.
3. Clarify the nature and dimensions of the platform that is to support the condensing units. Reference Section 304.9, IMC 2003.
4. Show how the fan coils and the exhaust fan are to be connected to the structure. Reference Sections 302.1 and 302.4, IMC 2003.
03/05/2007 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Revise the electrical data for the water heater per the manufacturer's requirements.
2. Revise the site plan so that the proposed building will not share a public sewer connection with the existing building. Reference Section 312.0, UPC 2003.
3. Coordinate the routing of the building drain and building sewer as shown on sheet C1 with sheet P1. Reference Section 103.2.3, UPC 2003.
4. Show that the restroom floors are sloped towards the floor drains. Reference Section 412.2.1, UPC 2003.
03/06/2007 CHRISTY FOREMAN BUILDING-COMMERCIAL REVIEW Denied CITY OF TUCSON DEVELOPMENT SERVICES
STRUCTURAL REVIEW COMMENTS

DATE: 3/14/07
ACTIVITY NUMBER: T06CM06047
PROJECT NAME: New office bldg.
PROJECT ADDRESS: 3922 N. Mountain
ARCHITECT / ENGINEER: Ron Robinette
PROJECT REVIEWER: Christy Foreman


TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL.

PLEASE CALL AT 791-5550 X1108 OR EMAIL AT CHRISTY.FOREMA1@TUCSONAZ.GOV IF YOU CARE TO DISCUSS.

1) Provide soils report.
2) Specify outrigger-framing members on sht. S2 - Framing Plan per structural calculation page 6.
3) Sht. S1 - WF1 footing should specify reinforcement per structural calculation pg. 12 2- #5.
4) Provide vertical grab bar per section 604.5.1 of ANSI A117.1 2003 for acessible water closet stall.
5) Provide accessible ramps / route from accessible parking that complies with ANSI A117.1 2003 see suggested layout provided from Department of Justice.
6) Drinking fountain spout heights and water flow ANSI 602.4 and 602.6.
7) Submit two sets of shop drawings and calculations, stamped and signed by an Arizona Registered Engineer, shop drawings shall be reviewed by and bear the approval of the Engineer or Architect of Record prior to submission to the City of Tucson, Development Services Department for approval prior to erection for:
1. Trusses
03/23/2007 FSANCHE1 ZONING REVIEW Needs Review