Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T06CM05951
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/17/2006 | SUZANNE BOHNET | ENGINEERING | REVIEW | Approved | |
| 11/21/2006 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | 1a)IT APPEARS TWO PERMITS WILL BE REQUIRED TO SPLIT LAST ADDRESSED TENANT SPACE. 1b) JUSTIFY ALLOWABLE AREAS FROM UBC. DO NOT MATCH OUR UBC ALLOWABLES. THE CHANGES WILL NEED TO CONFORM WITH THE IBC 2003. 2)PROVIDE DIMENSIONED SETBACKS FROM PROPERTY LINES. PROVIDE SITEPLAN THAT INCLUDES PARKING LAYOUT WITH ACCESSIBLE ROUTE. 3) CLARIFY SEPARATED USE AND SQUARE FOOTAGE. 4) CLARIFY TENANT SQ. FOOTAGE. 5) IT APPEARS YOUR TENANT SPACE IS OCCUPYING TWO SEPARATED SPACES OR BUILDINGS? PLEASE CLARIFY FIRE RATING AND RATED OPENINGS. 6) IT APPEARS A MENS AND WOMENS RESTROOM IS REQUIRED FOR BUSINESS OCCUPANCY THEREFORE ACCESSIBLE RESTROOMS NEED TO BE PROVIDED. IT APPEARS ONE OF THE RESTROOMS IS ACCESSED THROUGH A STROAGE ROOM. |
| 11/21/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Drains for the evaporative coolers may not terminate into plumbing vents. 2. How will ventilation air be supplied to the warehouse during the heating season? |
| 11/21/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T06CM05951 11/21/06 1. Track lighting on Ckt 24 would total 1125 VA for the purpose of feeder load calculations, not 844. Recompute feeder load calculations as necessary. 2. Intent with Ckt 6 is unclear. Electrical plan indicates track lighting. Panel schedule lists receptacle loads. 3. Track lighting on Ckt 14 would total 2813 VA for the purpose of feeder load calculations, not 1440. Recompute feeder load calculations as necessary. 4. Provide information sufficient to demonstrate that WH is cord-connected. 5. Provide electrical requirements for new Evaporative Coolers on Mechanical drawings. 6. Provide maintenance receptacles for new Evaporative coolers. |
| 11/21/2006 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 11/21/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The basis of the water calculations shll be the minimum supply pressure. 2. A Watts 007 RPBP has a pressure drop much greater than 4 PSI. 3. Clarify the size of the water meter - 3/4" or 1"? 4. Include the demand of the evaporative coolers when determining the total water demand. 5. Provide an upper terminal clean outs for the lavatories located in the southwest corner of the building. 6. Show how the temperature of the hot water supply to the lavatories is to be controlled. 7. Provide a detail for the installation of WH-2. 8. Provide the rim elevation of the upstream mnhole and the finished floor elevation. Evaluate the installation of a backwater valve. 9. Provide the size of the existing vent through the roof. 10. Provide a shut off valve for the water service to the building. 11. Provide cleanouts every 100 feet for the building drain. 12. Provide a drinking fountain per Chapter 2900, IBC 2003. |
| 11/22/2006 | HEATHER THRALL | ZONING | REVIEW | Approved | |
| 11/22/2006 | DAVE MANN | FIRE | REVIEW | Denied | Clarify occupancy group and allowable area. Provide details on existing fire separation per IFC Chapter 7. |
| 12/04/2006 | DROBEY1 | WWM | REVIEW | Needs Review | |
| 12/04/2006 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/04/2006 | DELMA ROBEY | APPROVAL SHELF | Completed |
| 12/04/2006 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
| 12/04/2006 | DELMA ROBEY | REJECT SHELF | Completed |