Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T06CM05814
Parcel: 133350040

Review Status: Completed

Review Details: REVISION - - 2ND

Permit Number - T06CM05814
Review Name: REVISION - - 2ND
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
12/10/2007 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL.

PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov
IF YOU CARE TO DISCUSS.

1. Equipment on Keynotes 1,2,6,9,and 12 have been removed from the Power Plan, but are still on the Feeder Schedule and Panel Schedules of the revised plans. Either reinstate these items on the plan, or remove them from the schedules, depending on intent.
2. Since Equipment on Keynote 4 has been removed from the Power Plan and the panel schedule, please remove it from the Feeder Schedule.
3. Since Equipment on Keynote 4 has been removed from the Power Plan and the panel schedule, please remove it from the Feeder Schedule.
4. Please note that Ckt E-4 indicates a Cheese Disp. Equipment 3, which is a microwave on the Feeder Schedule. Coordinate with Comments 2 and 3 above.
5. Clarify intent for equipment on Keynote 7. It was removed from the Power Plan, it remains on the Feeder Schedule, but on the panel schedule its circuit just indicates Rec with no load.
6. Equipment on Keynote 13a, and Ckt 37, 39, 41, would draw over 38A at 208V. The 30A circuit is inadequate.
7. Equipment on Keynote 13b, and Ckt 38,40,42, would draw less than 20A at 208V. Not sufficiently protected by the 50A breaker. Reference NEC 422.11.
8. Please note that Remarks for the load on E-38,40,42 indicate Equipment 31a, whereas according to the Feeder Schedule this is 13b. Coordinate with Comments 6 and 7 above.
9. Please add electrical loads for Ckts E-9, E-11,13, E-15, E-17, E-19, E-21,23,25, E-27,29, E-31,33,55, and E-18 to the panel schedule, and add them to the load calculations on this schedule and on Sheet E0.0. Note that this will significantly increase connected load, most of this equipment is allowed to be taken at 65% demand per NEC 220.56.