Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T06CM05657
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/30/2006 | TERRY STEVENS | ZONING | REVIEW | Approved | |
10/30/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Show that the ventilation for this occupancy conforms to the requirements of Section403.3, IMC 2003. |
10/30/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the waste and vent riser diagram to coordinate with the plumbing plan. Reference Section 103.2.3, UPC 2003. 2. The wash and rinse sections of the south 3-compartment sink must be directly connected to the building drain. 3. Remove the valve between the water heater and the expansion tank. 4. Provide a complete design for the gas piping per Chapter 12, UPC 2003. 5. Show that the hub drain meets the requirements of Sections 412.1 and 804.1, UPC 2003. 6. Show how the water piping has been sized. Reference Section 103.2.3, UPC 2003. 7. Provide cleanouts for the new fixtures per Section 707.4, UPC 2003. 8. Provide vents for each trap. Reference Section 901.0, UPC 2003. 9. Provide a drinking fountain per Chapter 2900, IBC 2003. 10. The minimum font size for all drawings is 1/8", all upper case. |
10/30/2006 | SUZANNE BOHNET | ENGINEERING | REVIEW | Approved | |
10/30/2006 | MARTIN HAEBERLE | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Need allowable area of building 2. Provide tenant seperation information 3. Adjacent tenant ? |
10/30/2006 | DAVE MANN | FIRE | REVIEW | Approved | |
11/09/2006 | CAGUILA1 | WWM | REVIEW | Needs Review | |
11/09/2006 | CAGUILA1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
11/09/2006 | DROBEY1 | WATER | REVIEW | Needs Review | |
11/09/2006 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |