Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T06CM05613
Parcel: 136406740

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T06CM05613
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/05/2007 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference Section 302.3, Uniform Administrative Code, 1997.
2. The tenant improvement drawings do not appear to represent the same building shown in the reference shell building drawings (e.g. the locations of the building columns, restrooms, and exterior doors are different). Please resolve these issues. Reference Section 103.2.3, UPC 2003.
3. Provide plumbing plans for the new work, including water isometrics and waste and vent isometrics. Reference Section 103.2.3, UPC 2003.
4. Provide a natural gas piping design for the gas-electric rooftop units scheduled on M-1, including the piping layout on a floor plan and a natural gas schematic showing the sizes, loads and developed lengths of the piping. Reference Section 103.2.3, UPC 2003.
5. Provide the minimum plumbing facilities (e.g. a drinking fountain) required by Table 2902.1, IBC 2003, as amended by the City of Tucson, for Business occupancy.
6. Provide structural calculations for the water heater shelf to show that the water heater is safely supported. Reference Section 310.0, UPC 2003.
7. If the specified water heater is not supplied with integral heat traps, provide heat traps on the supply and discharge piping. Reference Section 804.4, IECC 2003.
8. If the specified water heater is not supplied with integral heat traps, provide 0.5" of insulation with a maximum conductivity of 0.27 btu per inch/h °F on the first 8 feet of supply and discharge piping. Reference Section 804.5, IECC 2003.
9. Include all fixtures (i.e. the dental chair water supply) when calculating the total demand and determining pipe sizes. Reference Section 610.1, UPC 2003.
10. Provide information to show how the outlet temperature of the hot water is to be limited to 110 degrees at the lavatory. Reference Section 414.1, UPC 2003 and Section 804.3, IECC 2003.
01/05/2007 ROBERT SHERRY WATER REVIEW Approved
01/08/2007 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. The existing rooftop units are scheduled as heat pumps on the reference shell building drawings but are scheduled as gas-electric AC units on sheet M1 with curious performance and electrical data. Please clarify.
2. Specify the minimum resistance (R-value) of the duct insulation to be used on this project. Reference Section 803.2.8, IECC 2003.
3. Show the size, routing, and termination of the condensate drains (not shown on P-1 as noted). Reference Section 307.2, IMC 2003 and Section 807.2, UPC 2003.
4. Clarify the status of the exhaust fans, new or existing. Reference Section 106.3.1, IMC 2003.
5. Ventilation for restrooms in public spaces requires a minimum of 75 CFM of mechanical exhaust per water closet or urinal. Reference Table 403.3, IMC 2003.
6. Provide calculations demonstrating adequate ventilation and to show that the common ventilation system is sized in accordance with Sections 401.2 and 403.3.2, IMC 2003.
7. Clarify the design of the ductwork for the three rooftop units, specifically the connection of the rooftop units to the distribution ducts. Reference Section 106.3.1, IMC 2003.
8. Provide information to show that the duct sizes are adequate to convey the specified air flows. Reference Section 603.2, IMC 2003.
01/24/2007 WILDAN BUILDING-COMMERCIAL REVIEW Approved
01/25/2007 WILDAN ELECTRICAL-COMMERCIAL REVIEW Approved
02/01/2007 STEVE SHIELDS ZONING REVIEW Approved
02/08/2007 PAUL MACHADO ENGINEERING REVIEW Approved
12/27/2006 DAVE MANN FIRE REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
02/23/2007 FSANCHE1 OUT TO CUSTOMER Completed
02/23/2007 SUE REEVES REJECT SHELF Completed