Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/02/2006 | DAVE MANN | FIRE | REVIEW | Approved | |
11/02/2006 | STEVE SHIELDS | ZONING HC SITE | REVIEW | Denied | See zoning comments. |
11/13/2006 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: American Home Furnishings - Warehouse Expansion T06CM05594 Site Plan (1st Review) TRANSMITTAL DATE: November 13, 2006 COMMENTS: Please resubmit revised drawings along with redlines and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. This site plan was reviewed for full code compliance with the City of Tucson Development Standards (D.S.) and Land Use Code (LUC) due to an expansion of greater then 25% of building/structure area. 2. This site plan was reviewed as "STOREAGE USE GROUP, COMMERCIAL STORAGE, Subject to LUC Sec. 3.5.10.1" and the following comments reflect this review. Zoning is in the process verifying if this project requires review under LUC Sec. 3.5.9.7 "LARGE RETAIL ESTABLISHMENT" design criteria. Information regarding this project has been forwarded to the City of Tucson's Zoning Administrator and Attorney's office so that a determination can be made in regards to the large retail establishment. Additional review and comments may be forth coming. 3. It appears that this project is comprised of four (4) different parcels. Prior to approval of the site plan the parcels will need to be combined. Provide a Pima County Tax Parcel Combo and a recorded covenant regarding development and use of real property. 4. Add a note to the plan stating "THIS SITE PLAN IS DESIGNED TO MEET THE REQUIREMENTS OF THE OVERLAY ZONES, MAJOR STREETS AND ROUTES (MS&R) SETBACK ZONE". 5. D.S. 2-02.2.1.A.3 Provide the project address. 6. D.S. 2-02.2.1.A.5 Show the size, height, overhangs and canopies for all existing and proposed buildings. 7. LUC 3.2.6.5.B.1 & D.S. 2-02.2.1.A.7 Provide the required building setbacks from Prince Road and Weymouth Street. This set back is based on the location of the existing or future curb along Prince Road and Weymouth Street. Future curb needs to be shown along Prince Road and then the required setback dimensioned from the back of future curb. Label the future and existing curb along both Prince Road and Weymouth Street. If the future and existing curb are one in the same label the curb as existing & future. The setback for both Prince Road and Weymouth Street is 21' or the height of the building which ever is greatest. The required setback can not be determined until the height of the proposed addition is provided on the plan, see comment 3. Be aware that a future taper is planned for this area, see engineering comments. The east setback and setback line shown is incorrect. Per LUC 3.2.6.4 I1 to I1 zone requires a 0 setback. 8. D.S. 2-02.2.1.A.8 Fully dimension the parking layout. Provide typical details for both handicapped and standard parking spaces. 9. D.S. 2-02.2.1.A.8 & D.S. 3-05.2.3.C.1Post barricades or wheel stop curbing designed to prevent parked vehicles from overhanging adjacent sidewalk area are required at the new handicapped/standard parking spaces provide in the southwest corner where the new addition meets the existing unless the sidewalk is a minimum of 6'-6" wide. 10. D.S. 2-02.2.1.A.9 Provide off-street bicycle parking, including material for lighting, paving, and security; fully dimensioned layout; location; specific type of rack and the number of bicycles is supports; and the location and type of directional signage if required. 11. D.S. 2-02.2.1.A.10 Provide existing and future sight visibility triangles (SVT) for the PAALs access from Prince. 12. D.S. 2-02.2.1.A.10 Provide a dimension for the PAAL access from Prince where the new curb is shown. 13. D.S. 2-02.2.1.A.12 Delineate between existing and proposed sidewalks. It is unclear which sidewalks are new and which are existing. 14. D.S. 2-02.2.1.A.12 & D.S. 2-08.4.1.B A sidewalk will be provided adjacent and parallel to any PAAL on the side where a building is located. There is no sidewalk shown on the south side of the proposed addition and at appears that there is not enough room to provide a sidewalk around the southeast corner of the building. 15. D.S. 2-02.2.1.A.12 It appears that there are new handicapped/standard parking spaces provide in the southwest corner where the new addition meets the existing. It is unclear how the handicapped accessible aisle will access the sidewalk, clarify. Detectable warnings (truncated domes) will be required at all curb access ramps. ICC/ANSI A117.1-2003 Sec. 406.13 16. D.S. 2-02.2.1.A.12 & D.S. 2-08.1 An accessible route is required from the main entrance of the building to the sidewalk in the right-of-way along Prince Road. There is a sidewalk shown with a crosswalk across the PAAL and then a sidewalk out to Prince Road. There are no curb access ramps or areas that indicate that the sidewalk is flush with the pavement, therefore it is unclear where the accessible route is located, clarify. 17. D.S. 2-02.2.1.A.12 Until the bicycle parking has been identified zoning can not verify the bicycle circulation. 18. D.S. 2-02.2.1.A.13 Provide the location, type, size and height of existing and proposed freestanding signage and/or billboards. 19. D.S. 2-02.2.1.A.14 Fully dimension the loading spaces and maneuvering area. 20. Label Price Road as an MS&R route. D.S. 2-02.2.1.A.18 21. D.S. 2-02.2.1.A.25 If applicable provide existing and proposed lighting layout and type. 22. D.S. 2-02.2.1.A.28 Provide on plans existing zoning of this project and the adjacent parcels. 23. D.S. 2-02.2.1.A.31 Provide the existing and proposed use on the plan. 24. D.S. 2-02.2.1.A.32 Provide the refuse container location on the plan. 25. D.S. 2-02.2.1.A.38 Per the last approved site plan there was a DSMR approved for the pedestrian access near the southwest loading zones, provide the DSMP information on the plan. 26. D.S. 2-02.2.2.A.3 Provide a Floor Area Ration (FAR) per LUC 3.2.11.2.C 27. D.S. 2-02.2.2.A.4 The Disabled vehicle parking space calculation is incorrect. Per the IBC Table 1106.1, when 158 parking spaces are provided, then 6 handicapped spaces are required. Revise the calculation to show 6 required. Per the IBC Sec. 1106.5 if 14 vehicle handicapped spaces are provide then 3 must be van accessible. Provide this calculation on the plan. 28. D.S. 2-02.2.2.A.4 Provide a bicycle parking calculation on the plan. 29. D.S. 2-02.2.2.A.4 Provide a building & site area expansion calculation on the plan. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 791-5608 ext. 1180. C:\planning\site\t06cm05494.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan and additional requested documents |
11/14/2006 | ANDREW CONNOR | LANDSCAPE | REVIEW | Denied | 1. A street landscape border per LUC 3.7.2.4, is an 10' area running the full length of the street property line bounding the site except for points of ingress-egress. Portions of the landscape border along I-10 appear not to meet requirements. Include dimensions of landscape borders. 2. Show on the site and landscape plans future sight visibility triangles DS 2-02.2.2.1.A.10. 3. Show the locations on the landscape plan of all screening elements per DS 2-07. 4. Include inside dimensions or details of strip planter within vehicle use area on the landscape and site plans. A minimum of 4' in width must be provided for each canopy tree. The measurement is always within the planter area and does not include any material which defines the outer edge of the unpaved area per DS 2-06.3.3.C. Some planters within vehicle use area appear not to meet requirements. 5. Basins shall be required to conform to the following slope to depth ratios: 3 feet deep and greater maximum 4:1. Revise basin as necessary (Comment is an engineering aspect). 6. Landscaping is required along retention basin side slopes, bottom and periphery. Plant materials used in basins shall withstand periodic inundation. A minimum of 20 trees per acre must be provided, 33% of tress shall be 24" box or larger. A minimum of 2 shrubs for each tree is required per DS 10.01. Revise landscape plan to include basin(s) treatment. 7. Additional comments may apply. |
11/15/2006 | ANDREW CONNOR | NPPO | REVIEW | Approved | |
12/13/2006 | PATRICIA GILBERT | ENGINEERING | REVIEW | Denied | DATE: December 13, 2006 ACTIVITY NUMBER: T06CM05594 PROJECT NAME: American Home Furninshings PROJECT ADDRESS: 2020 West Prince Road PROJECT REVIEWER: Patricia Gilbert, Engineering Associate The following items must be revised or added to the site plan. Please include a response letter with the next submittal that states how all comments have been addressed. RESUBMITTAL REQUIRED: SITE PLAN, DRAINAGE REPORT SUBMITTAL: GEOTECHNICIAL REPORT (Soil's Report) This review is for site plan content and specifications per DS 2-02. 1. Site plan cannot be approved until Lot Combination recordation is complete with Pima County. D.S. 2-02.2.1.A.2. 2. Reduce the scale to provide all the required site plan information on one sheet. Remove word "Amended" and verbiage "paving and grading" from the sheet that is designated the site plan. Provide the site plan on one sheet and provide all the required information per DS 2-02 Site Plan Content and Specifications. 3. Provide the project address on the site plan. DS 2-02.2.1.A.3. 4. Be advised this review was only for site plan content and specifications and a separate grading review and permit is required. Please submit a grading permit application card (the green card) with the second submittal. A stormwater pollution prevention plan (SWPPP) is required with the grading permit when there is an acre or more of disturbance. If disturbance is an acre or more submit a SWPPP with the grading permit application with the second submittal. 5. On the grading sheets remove any reference to site plan (i.e. title block). These plans will be utilized for the grading plan submittal/review. 6. Provide in a general note on the site plan the calculated disturbance area. 7. Remove from the lower right hand corner of the first sheet the type 2 grading block and "Accepted" signature line. 8. Provide existing sight visibility triangles (SVT) for the entrance / exit drive to Weymouth Street. The near side length is 185' and the far side length is 110'. DS 2-02.2.1.A.10. 9. Provide existing and future SVTs for both entrance / exit drives to Prince Road. The near side length is 345' and the far side length is 125'. DS 2-02.2.1.A.10. 10. Provide on the site plan dimensions for all entrance / exit drives and PAALs. DS 2-02.2.1.A.11. 11. A minimum setback distance of five (5) feet for a pedestrian refuge area must be maintained between any enclosed structure and a PAAL. 4' sidewalk is required within the pedestrian refuge. Provide a sidewalk and pedestrian refuge between the building and PAAL located on the south side of the project. Revise plan as necessary and dimension accordingly. DS 3-05.2.2.B.1., Figure 1, DS 2-02.2.1.A.12. and DS 2-08.4.1.B. 12. Add a general note to the plan that the entire property lies within a FEMA floodplain Zone AO Depth of 1' and a floodplain use permit is required for any development on this property. DS 2-02.2.1.A.15. 13. Once construction is complete, a condition of this permit contains a requirement that the applicant, or the applicant's authorized representative, complete a FEMA Elevation Certificate and is returned to the Development Services Department (DSD) Engineering Division prior to approval of final inspection. The original elevation certificate must be returned to the DSD Engineering Division. Add a general note to the plan that an elevation certificate is required prior to release of the Certificate of Occupancy. 14. Please note that any mechanical equipment; water heaters, air conditioning systems, coolers, etc, must be elevated one foot above the water surface elevation and certified on the same elevation certificate for the structure. Chapter 26.5.2. 15. Submit a floodplain use permit application with the second submittal. The application can be obtained at the Engineering Counter at the Development Services Department. 16. Show on the plan view vehicle maneuverability for the loading spaces. DS 2-02.2.1.A.14. 17. On the site plan provide general drainage patterns, proposed finish floor elevations (FFE) and finish grades. DS 2-02.2.1.A.16. 18. Clearly indicate on the plan the datum used for the FFE. DS 2-02.2.1.A.16. 19. Dimension from the street centerline of Prince Road to the future curb and sidewalk location. Label accordingly. DS 2-02.2.1.A.19. 20. Label Prince road as an MS&R Route. DS 2-02.2.1.A.18. 21. Dimension from street centerline of Weymouth Street to the existing curb and sidewalk location. Provide the width of the sidewalk and label accordingly. DS 2-02.2.1.A.21. 22. Label and dimension from the street centerline of Prince Road to the existing curb and sidewalk location. Label appropriately. DS 2-02.2.1.A.21. 23. Provide the datum for the benchmark, general note number 6. DS 2-02.2.1.A.23. 24. Provide the locations of all solid waste enclosures, indicate if the enclosures are existing or proposed. IF any solid waste enclosures are proposed provide a detail of the solid waste enclosure and show maneuverability for the solid waste vehicle. DS 6-01. 25. Provide on the site plan the 100-year peak discharge concentration points, existing and proposed. 26. On sheet 2 there are grading limits established around the basin. It is acknowledged after speaking with the applicant the basin will be relocate to the north. Be aware that the parcels where the basin is located will need to be included in the lot combination. (See comment 1) 27. In addition to the above comment the drainage report will need to be revised to reflect the change in basin location. Be advised a more comprehensive drainage report will need to be submitted that follows the criteria found in the Standards Manual of Drainage Design and Floodplain Management SMDDFM 2.3.1. 28. A minimum of one 15-foot-wide vehicular access ramp shall be provided into the basin. The maximum roadway or access ramp slope shall not exceed 15 percent. Provide a ramp for basin maintenance. SMDDFM 2.3.1.6.A.4.b. 29. A soils report is required in conjunction with the design of each surface storage facility that utilizes infiltration as a method of basin drainage. Percolation test must show a maximum disposal time of 12 hours. At minimum, provide a soil's report that addresses the maximum disposal time for a storage facility that utilizes infiltration as a method of drainage. SDRM 3.5.1.5. and SMDDFM 14.2.6. 30. Please note that subsequent comments may be necessary upon resubmittal, depending on the nature and extent of revisions that occur to the plans. GENERAL DRAINAGE REPORT COMMENTS 1. Be advised a more comprehensive drainage report will need to be submitted that follows the criteria found in the Standards Manual of Drainage Design and Floodplain Management SMDDFM 2.3.1. The drainage report will need to be revised to reflect the change in basin location, provide appropriate calculations, sizing and details for any new hydraulic structures that support the function of the basin. 2. Provide existing and developed hydrology site map/plan. Provide off site drainage information on a plan and any appropriate discussion to support the plan. Provide a general site plan showing existing and proposed drainage structures, Q, etc. SMDDFM 2.3.1. 3. Provide the 100-year peak discharge concentration points, existing and proposed on the appropriate plan(s). 4. Per SMDDRM, 2.3.1.6.C., a very detailed Detention/Retention Basin Maintenance Checklist and Schedule shall be provided by an Arizona Registered Professional Civil Engineer, which will be followed by anyone performing scheduled and unscheduled maintenance on behalf of the owner(s). A maintenance checklist and schedule shall be provided in the drainage report in effort to clearly communicate the responsibilities involved by the owner for proper maintenance of retention basins. Include a detailed retention basin maintenance checklist and schedule in the drainage report. 5. A minimum of one 15-foot-wide vehicular access ramp shall be provided into a basin. The maximum roadway or access ramp slope shall not exceed 15 percent. Provide a ramp for basin maintenance. SMDDFM 2.3.1.6.A.4.b. 6. Please note that subsequent comments may be necessary upon resubmittal, depending on the nature and extent of revisions that occur to the report. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/05/2007 | SUE REEVES | OUT TO CUSTOMER | Completed |
04/05/2007 | SUE REEVES | REJECT SHELF | Completed |