Permit Review Detail
Review Status: Completed
Review Details: OTHER
Permit Number - T06CM05412
Review Name: OTHER
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/03/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference Section 302.3, Uniform Administrative Code, 1997. 2. On Drawings 2002-0292 and 1002-0632, it appears that VOC=382.4V, not 386.4V for 8 panels in series. 3. On Drawing 2002-0292 and 1002-0632, it appears that VMP=320.0V, not 318.4V for 8 panels in series. 4. On Drawing 2002-0292 and 1002-0632, it appears that VOC=334.6V, not 338.1V for 7 panels in series. 5. On Drawing 2002-0292 and 1002-0632, it appears that VMP=280.0V, not 278.6V for 7 panels in series. 6. Not a Code issue, but it is unclear why one set of arrays consists of 7 panels in series and the other consists of 8 in series. 7. Demonstrate compliance with NEC 690.5 for Ground-Fault Detection. 8. Provide overcurrent protection for the Photovoltaic Source Circuits. Reference NEC 698.9 (A). 9. Would like to see manufacturer information such that (+) ground is verifiable. 10. Please specify the marking required by NEC 690.14 (C) (2). 11. Conductors from Photovoltaic Combiner Panel to the Service entrance need to be evercurrent protected at the Combiner Panel. 12. Provide fault current rating of Combiner Panel. 13. Provide TEP available fault current at Combiner Panel. 14. Specify the warning sign required by NEC 690.17. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/21/2006 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
| 12/21/2006 | SUE REEVES | REJECT SHELF | Completed |