Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T06CM05235
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/02/2006 | DOUG LAAKSO | BUILDING-COMMERCIAL | REVIEW | Denied | S1. CLARIFY ACCESSIBILITY, SHOW AND NOTE ON DRAWINGS WHERE 20% OF PROJECT COST IS SPENT ON ACCESSIBILITY (RESTROOMS) PER IBC SEC 3409 AND ANSI A117.1-2003 ED. S2. SHOW WIDTH OF CORRIDORS ON FLOOR PLAN 3'8" MINIMUM PER IBC SEC 10. S3. PROVIDE LOADS/STRUCTURAL CALCULATIONS AND DETAILS FOR INSTALLATION OF X-RAY. S4. PROVIDE OFFICIAL ADDRESS SLIP FROM PIMA COUNTY FOR COMBINING TWO SUITES INTO ONE. |
10/02/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide ventilation calculations. Reference Section 403, IMC 2003. |
10/02/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
10/02/2006 | ROBERT SHERRY | WATER | REVIEW | Approved | |
10/02/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a riser diagram to clarify the nature of the plumbing changes to the relocated sink. 2. Show how the current vacuum and compressed air systems are being modified. |
10/02/2006 | SUZANNE BOHNET | ENGINEERING | REVIEW | Approved | 96" RCP under Alvernon at Grant and topography made this proposed work outside of inundated areas. |
10/05/2006 | DROBEY1 | ZONING | REVIEW | Needs Review | |
10/05/2006 | DROBEY1 | WWM | REVIEW | Needs Review | |
10/05/2006 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
10/05/2006 | DROBEY1 | FIRE | REVIEW | Needs Review |