Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T06CM05225
Parcel: 12108303A

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T06CM05225
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/03/2006 MICHAEL ST. PAUL ZONING REVIEW Approved
10/03/2006 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Revise the ventilation calculations to correct the arithmetic and to consider the common supply of outside air per Section 403.3.2, IMC 2003.
2. HP-1 or AC-1?
3. A note on sheet M1 calls for coordination of the rooftop unit placement with the structural engineer. Provide structural drawings and calculations.
10/03/2006 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied
10/03/2006 ROBERT SHERRY WATER REVIEW Approved
10/03/2006 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. What is connected to the 3" building drain after it exits the tenant's space?
2. How was the water piping sized?
3. Provide details of the wall construction and connection of the platform for the water heater mount.
4. Revise the font size of the keynotes.
5. Clarify the location of the termination of the T&P relief and the condensate drain. - is it actually outside?
10/03/2006 SUZANNE BOHNET ENGINEERING REVIEW Approved
10/06/2006 JWILLIA5 BUILDING-COMMERCIAL REVIEW Needs Review
10/10/2006 DROBEY1 WWM REVIEW Needs Review
10/10/2006 DROBEY1 FIRE REVIEW Needs Review
10/10/2006 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
10/10/2006 DELMA ROBEY OUT TO CUSTOMER Completed