Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T06CM05225
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/03/2006 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
10/03/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the ventilation calculations to correct the arithmetic and to consider the common supply of outside air per Section 403.3.2, IMC 2003. 2. HP-1 or AC-1? 3. A note on sheet M1 calls for coordination of the rooftop unit placement with the structural engineer. Provide structural drawings and calculations. |
10/03/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | |
10/03/2006 | ROBERT SHERRY | WATER | REVIEW | Approved | |
10/03/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. What is connected to the 3" building drain after it exits the tenant's space? 2. How was the water piping sized? 3. Provide details of the wall construction and connection of the platform for the water heater mount. 4. Revise the font size of the keynotes. 5. Clarify the location of the termination of the T&P relief and the condensate drain. - is it actually outside? |
10/03/2006 | SUZANNE BOHNET | ENGINEERING | REVIEW | Approved | |
10/06/2006 | JWILLIA5 | BUILDING-COMMERCIAL | REVIEW | Needs Review | |
10/10/2006 | DROBEY1 | WWM | REVIEW | Needs Review | |
10/10/2006 | DROBEY1 | FIRE | REVIEW | Needs Review | |
10/10/2006 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/10/2006 | DELMA ROBEY | OUT TO CUSTOMER | Completed |