Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T06CM05154
Review Name: COMMERCIAL NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/26/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
| 09/27/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T06CM05154 9/27/06 SEE THE ATTACHED ELECTRICAL PERMITTING REQUIREMENTS. DESIGN SHALL INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING. 1. Show each piece of electrical equipment plotted on scaled drawing. 2. Specify conduit and conductor size and type. 3. Provide a disconnecting means for the motors. Reference NEC 430 Part IX. 4. Provide an electrical line diagram of the installation. 5. Provide motor overload protection. Reference NEC 430 Part III. 6. Provide motor ground fault and short circuit protection. Reference NEC 430 Part IV. 7. Specify the Grounding Electrode System, Main Bonding Jumper, Grounding Electrode Conductor, and Equipment Bonding. Reference NEC 250. 8. Provide available fault current. 9. Provide fault calculations. 10. Provide fault current rating of equipment. 11. Provide service disconnect. Reference NEC 230. |
| 10/05/2006 | SREEVES1 | WWM | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 11/16/2006 | VFLORES1 | OUT TO CUSTOMER | Completed |