Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T06CM05135
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/02/2006 | DAVE MANN | FIRE | REVIEW | Approved | |
10/02/2006 | BETSY COTTLE | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | site plan not approved by 10/01/06 eastern district 2513 sf $5,045.84 |
10/30/2006 | PATRICIA GILBERT | ENGINEERING | REVIEW | Denied | Submit the approved site plan with the building plan. |
10/30/2006 | LINHART PETERSEN POERS ASSOC. | BUILDING-COMMERCIAL | REVIEW | Approved | October 25th, 2006 City of Tucson Tucson Appl. No. T06CM05135 Bureau Veritas Job No. 01006-161054 City of Tucson 201 N. Stone Ave. 1st Floor Tucson, AZ 85701 Re: Plan Review: Holy Resurrection Church Classroom Building Address: 5910 E. 5th St. Bldg. #2 Bureau Veritas has completed a review of the following documents on behalf of the City of Tucson: 1. Plans: Two (2) sets of plans (Sheets C1 thru E7): Stamped and Dated Richard Roghear Burton-Architect Dated 9/12/06. 2. Truss Calculations: None provided. 3. Structural Calculations: 2 sets Stamped by M.K. Medi and dated 8-25-06 These documents were reviewed only for their conformance to the provisions of the 2003 International Building Codes (i.e., State of Arizona and Pima County amended 2003 IRC, 2003 IMC, 2002 NEC and 2003 IPC). Our comments follow on the attached list. Please submit response letter and required number of complete and revised documents. Sincerely; Bureau Veritas Shelley K. Knuffke Plans Examiner cc;sk enclosures A. The following plan review comments are based on the City of Tucson Building Regulations and referred to the 2003 International Building Code and City of Tucson Pool and Spa Code. B. Please respond in writing to each comment by marking the attached comment list or creating a response letter. Indicate which detail, specification, or calculation shows the requested information. Your complete and clear responses will expedite the re-check and hopefully, approval of this project. Thank you for your assistance. C. These plan review comments are based on building code items only. If site-related comments are applicable to this project, they will be generated by others (e.g., City Engineering, Public Works, Health, etc.). General Comments: Index does not reflect sheets in plan set. Please provide gas demand for Education Building Please provide separate plumbing plans and schedules for Education Building. |
11/06/2006 | GERRY KOZIOL | WWM | REVIEW | Denied | 1. HOLY RESURECTION ANTIOCHIAN ORTHODOX CHURCH - CLASSROOMS 2. NEEDS WASTEWATER 8TH FLOOR REVIEW FO BUILDING ADJACENT TO 10'-0 PUBLIC SEWER EASEMENT DKT1445 PG169 3. NEEDS REVIEW OF LOCATION OF CONNECTION TO PUBLIC SEWER SITE PLAN SHOWS A WEST CONNECTION - BUILDING PLANS SHOW AND EAST CONNECTION |
12/20/2006 | LINHART PETERSEN POERS ASSOC. | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
12/20/2006 | LINHART PETERSEN POERS ASSOC. | PLUMBING-COMMERCIAL | REVIEW | Approved | |
12/20/2006 | LINHART PETERSEN POERS ASSOC. | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
12/20/2006 | ROBERT SHERRY | WATER | REVIEW | Approved | |
12/21/2006 | DAVID RIVERA | ZONING | REVIEW | Denied | 12/21/06 Development Services Department Zoning Review Section David Rivera Principal Planner Comments: 1. Zoning has reviewed the building plans but cannot approve them at this time until two copies of the approved and stamped site, landscape and NPPO plans have been provided with the building plans. Please ensure that the approved and stamped site, landscape and NPPO plans arre stapled to the building plans. completely approved through the commercial review process. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/26/2006 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
12/26/2006 | GERARDO BONILLA | REJECT SHELF | Completed |