Permit Review Detail
Review Status: Completed
Review Details: POST 3RD PARTY REVIEW
Permit Number - T06CM04841
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/02/2007 | ROBERT SHERRY | WATER | REVIEW | Denied | Reduced pressure backflow prevention assemblies shall be installed in locations accessible to Tucson Water. Reference COT Ordinance 9976, http://www.tucsonaz.gov/water/docs/backflow-ord.pdf |
| 07/03/2007 | DAVE MANN | FIRE | REVIEW | Denied | Please indicate proposed fire riser and Fire Department Connection locations. Please add the following automatic sprinkler criteria to the plans: 1. The hazard classification of the occupancy including any special hazards. 2. The design standard to be used. 3. The availability and adequacy of the water supply. 4. The design density and the area of operation. |
| 07/11/2007 | GERRY KOZIOL | WWM | REVIEW | Needs Review | 1: STAYBRIDGE SUITES BY HOLIDAY INN- ISSUED WITH GREASE INTERCEPTOR- 1113FU @ SFR RATE FOR APARTMENTS & 156FU @ COMMERCIAL RATE FOR COMMON AREAS 2: NEEDS TO PERMIT ON-SITE PRIVATE SEWER 3: ELEVATOR SUMP PUMP TO DISCHARGE TO PRTABLE TANK 4:CANNOT DRAIN/BACKWAS PLLO/SPA INTO PUBLIC SEWER PER WASTEWATER ORD (2-4" STANDPIPES FOR PERIMETER DECK DRAIN VIA SUMP PUMP & POOL BACKWASH NOT INCLUDED ABOVE) |
| 07/17/2007 | JASON GREEN | ENGINEERING | REVIEW | Denied | Building plans can not be approved prior to Development plan (D06-0040) and site plan approval. The DP is out for corrections. |
| 07/19/2007 | TERRY STEVENS | ZONING | REVIEW | Denied | 07/19/07 Development Services Department Zoning Review Section Terry Stevens Lead Planner Comments: 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped development, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site/development plan. Additional comments may be forthcoming. 4. A site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the building plan can be approved by Zoning. Two copies of the approved development plan, landscape and NPPO plans are to be submitted with the building plans packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The development plan may be walked through for stamps and site card sign off. Submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the building plans packet processed together for site approval |
| 07/20/2007 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | Impact Fee's Do Apply; West District; 99 Room Hotel; $59,598.50 |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/08/2007 | SUE REEVES | OUT TO CUSTOMER | Completed |
| 08/08/2007 | SUE REEVES | REJECT SHELF | Completed |