Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - SITE ALL
Permit Number - T06CM04805
Review Name: RESUBMITTAL - SITE ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/11/2007 | TERRY STEVENS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Terry Stevens FOR: David Rivera Lead Planner Principal Planner PROJECT:T06CM04785 and T06CM04805 3150 & 3162 N. Freeway Industrial Loop Site Plans Transmittal date:3rd Review 4-11-07 COMMENTS: Please resubmit revised drawings along with redlines and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. The cross access agreement has been provided. Provide the recordation information (docket and page) on the site plan. 2. DS 2-02.2.1.9 The following comment has not been completely addressed. Provide the number and location of required Class 1 bicycle parking spaces as well as a detail of the locker type. See LUC Sec. 3.3.4 and DS 2-09. The location of the class 1 bicycle parking spaces have been provided. Provide a detail of how the required security measures will be provided. 3. DS 2-02.2.1.12 An accessible pedestrian circulation path is required from the parking spaces at the southern side of the project connecting to both buildings. (sidewalk, handicap ramps, cross walk, etc.) Handicap ramps missing a the pedestrian refuge area connecting to the sidewalks The vehicle maneuvering area indicated at the southeast corner of the fenced area for building 2 cannot overlap the pedestrian refuge area. Revise. 4. DS 2-02.2.1.14 The loading zone locate d on the north side of building 1 is required to be a minimum of 12 x 55. Revise. 5. DS 2-02.2.1.20 The documentation provided for the easement encroachment and the letter from John Clark indicate that a specially designed concrete reinforced slab is to be provided over the sewer line area. The plan indicates a paved area. Clarify on the plans. The PCWW easement agreement requires that the document be recorded. Provide on the site plan the recordation information (docket and page). 6. DS 2-02.2.1.25 This comment has not been fully addressed. Provide a detail of the proposed pole light with dimensions showing clearance above grade to the light fixture. The minimum clearance above a PAAL per DS 3-05.2.1.C.4 is fifteen (15) feet. The provided detail does not indicate height. 7. DS 2-02.2.1.31 The following comment has not been addressed. The indicated proposed use of "Industrial" is a use group not a specific use. Provide the specific use for this project with the "subject to:" sections applicable as per LUC 2.7.2.2.A, .1 thru .8. Clearly indicate how all subject to sections of the proposed use are complied with. 8. Based on changes to the plans and responses to the comments further comments may be forth coming. If you have any questions about this transmittal, please call Terry Stevens, (520) 837-4961. |
| 04/11/2007 | TERRY STEVENS | ZONING HC SITE | REVIEW | Denied | see zoning comments |
| 04/19/2007 | ANDREW CONNOR | LANDSCAPE | REVIEW | Denied | 1. Replicate the entire approved landscape for lot 18 indicated on Sheet L4 of the approved tentative plat Case # S99-053 on the current submitted plan. 2. The site plan and landscape plan must show identical site layout to avoid conflict between the two plans. Ensure that all changes to the site plan are reflected on the landscape plan. |
| 05/14/2007 | PATRICIA GILBERT | ENGINEERING | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/23/2007 | DELMA ROBEY | APPROVAL SHELF | Completed |
| 05/23/2007 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
| 05/23/2007 | DELMA ROBEY | REJECT SHELF | Completed |