Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T06CM04719
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/23/2006 | HEATHER THRALL | ZONING | REVIEW | Approved | |
| 08/23/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. The operation of EF-1 for the new restroom will result in recirulation of air from the restroom. Reference Section 403.2.1, IMC 2003. 2. Provide calculations to show that the common ventilation system is sized in accordance with Section 403.3.2, IMC 2003. 3. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference Section 302.3, Uniform Administrative Code, 1997. |
| 08/23/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
| 08/23/2006 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 08/23/2006 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | 1) Provide clear floor space for unisex and men's restroom per ansi A117.1 2003. 2) Provide work surface height and sink height in lounge per Ansi A117.1 2003. 3) Per chapt. 34 show breakdown on front sheet how 20% cost of construction is being spent towards accessibility. Include cost breakdown. 4) Clarify accessible path from parking lot to the restroom / primary function areas. |
| 08/23/2006 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 08/23/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference Section 302.3, Uniform Administrative Code, 1997. 2. Provide water pressure calculations to support the water pipe sizing. Note that the water closet has a 1" CW supply on sheet P1, a ½" CW supply on sheet P3 and a 1-1/2" CW supply based on the pipe sizing chart. Reference Section 610.1, UPC 2003. 3. The 2-way cleanout shown in Detail 1/P3 is in violation of Section 707.6, UPC 2003. |
| 08/23/2006 | SUZANNE BOHNET | ENGINEERING | REVIEW | Approved | |
| 08/23/2006 | DAVE MANN | FIRE | REVIEW | Approved | |
| 08/23/2006 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |