Permit Review Detail
Review Status: Completed
Review Details: OTHER
Permit Number - T06CM04626
Review Name: OTHER
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/20/2006 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | 1) PROVIDE ACCURATE BUDGET FOR VALUATION. INCLUDE COST OF STRUCTURAL. 2) IT APPEARS THERE IS A CONFLICT WITH BEAM AND COLUMN LOCATION AND NEW DUCT WORK. 3) PROVIDE SECTION SHOWING MECHANICAL LOAD AND HOW IT IS CARRIED DOWN TO SLAB FOOTING. |
09/20/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
09/20/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | See previous comments. Plans do not appear to have changed. |
09/20/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a vent and cleanout for the new grease trap. 2. Provide a diagram of the gas piping to show the total connected loads and developed lengths of the piping. The required information for the existing equipment is not shown on the drawing. 3. Show how the make up air unit can have a minimum heating capacity of 120 MBH with a maximum natural gas input of 100 CFH. |
09/21/2006 | DROBEY1 | WWM | REVIEW | Needs Review |