Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T06CM04626
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/17/2006 | HEATHER THRALL | ZONING | REVIEW | Approved | |
08/17/2006 | ANY | ENGINEERING | REVIEW | Approved | |
08/17/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T06CM04626 8/17/06 1. EF-1 is to be a 1/2 HP motor according to the equipment schedule on Sheet MP2.1. However, this equipment is on a 35A electrical circuit. Please coordinate electrical requirements with Mechanical and clarify. 2. Please demonstrate that new emergency lighting circuits meet the requirements of NEC 700.12 (E). Please note that the panel and circuit designations for this circuit is not indicated on the Electrical Lighting Plan. 3. It appears that the maintenance receptacle is on a switched circuit. Please clarify according to the requirements of NEC 210.63. 4. The use of 80% rating to determine the load on Panel B is questionable. Need more detailed information. |
08/17/2006 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | 1) PROVIDE ACCURATE BUDGET FOR VALUATION. 2) PROVIDE TOTAL SQ. FT. OF TENANT SPACE. 3) CLARIFY LOADS OF NEW MECHANICAL EQUIPMENT. PROVIDE STRUCTURAL CALCULATIONS JUSTIFYING EXISTING STRUCTURE CAN CARRY THE NEW LOADS. |
08/17/2006 | MARTIN BROWN | FIRE | REVIEW | Approved | |
08/21/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide information to show the listing of the hood supports the proposed exhaust flow. 2. Provide support details for the new make up air units |
08/21/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the trap of the 3-compartment sink to beequal in size to the conected trap arm. 2. Provide a vent and cleanout for the new grease trap. 3. Provide a diagram of the gas piping to show the total connected loads and developed lengths of the piping. |
08/21/2006 | ROBERT SHERRY | WATER | REVIEW | Approved | |
09/20/2006 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved | |
09/20/2006 | CAGUILA1 | WWM | REVIEW | Needs Review |