Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: POST 3RD PARTY REVIEW
Permit Number - T06CM04613
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/04/2007 | ROBERT SHERRY | WATER | REVIEW | Approved | |
01/04/2007 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | Copy of approved Development Plan/Site Plan must be submitted with building plans. |
01/04/2007 | DAVID RIVERA | ZONING | REVIEW | Denied | 01/04/07 Development Services Department Zoning Review Section David Rivera Principal Planner Comments: 1. Zoning has reviewed the building plans but cannot approve them at this time until the plans have been completely approved through the commercial review process. 2. A site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the grading plan can be approved by Zoning. Two copies of the CDRC approved tentative plat/development plan, landscape and NPPO plans are to be submitted with the grading plan packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The tentative plat/development plan may be walked through for stamps and site card sign off. Submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the grading plans packet processed together for site approval. 3. Zoning will re-review and approve the building plans on the next submittal providing the stamped and approved site plans are included with the building plan package and the building structural portions of the plan review have been approved. See comment 2 for additional info regarding the site plan process. |
01/09/2007 | GERRY KOZIOL | WWM | REVIEW | Denied | 1:best buy 2:needs to show location/method of connection to public sewer-need to permit on-site private sewer |
01/16/2007 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review | |
12/27/2006 | DAVE MANN | FIRE | REVIEW | Denied | Please add the following automatic sprinkler criteria to the plans: 1. The hazard classification of the occupancy including any special hazards. 2. The design standard to be used. 3. The availability and adequacy of the water supply. 4. The design density and the area of operation. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/07/2007 | GERARDO BONILLA | OUT TO CUSTOMER | Completed |
05/07/2007 | SUE REEVES | REJECT SHELF | Completed |