Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T06CM04613
Parcel: 137055090

Review Status: Completed

Review Details: POST 3RD PARTY REVIEW

Permit Number - T06CM04613
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/04/2007 ROBERT SHERRY WATER REVIEW Approved
01/04/2007 LOREN MAKUS ENGINEERING REVIEW Denied Copy of approved Development Plan/Site Plan must be submitted with building plans.
01/04/2007 DAVID RIVERA ZONING REVIEW Denied 01/04/07

Development Services Department
Zoning Review Section

David Rivera
Principal Planner

Comments:

1. Zoning has reviewed the building plans but cannot approve them at this time until the plans have been completely approved through the commercial review process.

2. A site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the grading plan can be approved by Zoning. Two copies of the CDRC approved tentative plat/development plan, landscape and NPPO plans are to be submitted with the grading plan packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The tentative plat/development plan may be walked through for stamps and site card sign off. Submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the grading plans packet processed together for site approval.

3. Zoning will re-review and approve the building plans on the next submittal providing the stamped and approved site plans are included with the building plan package and the building structural portions of the plan review have been approved. See comment 2 for additional info regarding the site plan process.
01/09/2007 GERRY KOZIOL WWM REVIEW Denied 1:best buy
2:needs to show location/method of connection to public sewer-need to permit on-site private sewer
01/16/2007 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review
12/27/2006 DAVE MANN FIRE REVIEW Denied Please add the following automatic sprinkler criteria to the plans:

1. The hazard classification of the occupancy including any special hazards.
2. The design standard to be used.
3. The availability and adequacy of the water supply.
4. The design density and the area of operation.

Final Status

Task End Date Reviewer's Name Type of Review Description
05/07/2007 GERARDO BONILLA OUT TO CUSTOMER Completed
05/07/2007 SUE REEVES REJECT SHELF Completed