Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/09/2006 | HEATHER THRALL | ZONING | REVIEW | Approved | |
08/09/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the roof top unit. Reference Section 302.1, IMC 2003. |
08/09/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T06CM04508 8/9/10 City does not allow current limiting characteristics of line side OCPDs to attenuate fault current at new electrical panels. It appears that AFC at new Panel A is 11, 588A. Suggest rating of 14K. |
08/09/2006 | ROBERT SHERRY | WATER | REVIEW | Approved | |
08/09/2006 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | 1) Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the roof top unit. Reference Section 302.1, IMC 2003. 2) Clarify sq. footage of suite. 3) Clarify occuancy of basement. 4) Clarify separated use / fire walls. 5) Location of address is not as shown on bldg site plan. Please clarify. |
08/09/2006 | SUZANNE BOHNET | ENGINEERING | REVIEW | Approved | |
08/09/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Show how the temperature of the hot water supply to the public lavatory controlled. Reference Section 414.1, UPC 2003 and Section 804.3, IECC 2003. 2. Show the size, route and termination of T&P relief piping. Reference Section 608.5, UPC 2003. 3. All storage-type water heaters installed in a closed system require a listed expansion tank. Please show expansion tanks on plans. Reference Section 608.3, UPC 2003 with local amendments. 4. Clarify the routing of the main building drain and show its size. (Note that the site key plan shows the project at the wrong location) |
09/19/2006 | GBONILL1 | WWM | REVIEW | Needs Review | |
09/19/2006 | GBONILL1 | FIRE | REVIEW | Needs Review | |
09/19/2006 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |