Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T06CM04430
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/02/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T06CM04430 8/2/06 1. Provide a lighting fixture schedule. 2. Identify panel and circuit numbers for all new electrical loads. Demonstrate that no feeder or branch circuit is overloaded. 3. Demonstrate compliance with the lighting power budget requirements of the 2003 IECC for new construction, and other area(s) constructed after 1994. |
| 08/02/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide energy calculations for the addition to the building. 2. Revise the capacity of the restroom exhaust fans to comply with Section 403.3, IMC 2003. 3. Show how the exhaust fans are to be operated to prevent recirculation of the air from the restrooms. Reference Section 403.2, IMC 2003. |
| 08/02/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the waste piping plan to comply with the requirements of the 2003 UPC. Show how the new piping relates to the existing piping. 2. Provide riser diagrams for the water supply and the waste piping. 3. Show the specifications and applicable standards for the fixtures being selected by the owner. 4. Show how the temperature of the water at the lavatories is to be limited to no more than 110 degrees Fahrenheit. 5. Show how the water piping has been sized and show that the additions do not overtax the existing water service. 6. The waste fixture units for this application shall be for assembly occupancy. |
| 08/02/2006 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 08/02/2006 | SUZANNE BOHNET | ENGINEERING | REVIEW | Approved | |
| 10/12/2006 | CAGUILA1 | ZONING | REVIEW | Needs Review | |
| 10/12/2006 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 10/12/2006 | CAGUILA1 | BUILDING-COMMERCIAL | REVIEW | Needs Review | |
| 10/12/2006 | CAGUILA1 | FIRE | REVIEW | Needs Review | |
| 10/12/2006 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved |