Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T06CM04413
Parcel: 12801005H

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T06CM04413
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/01/2006 TERRY STEVENS ZONING REVIEW Approved
08/01/2006 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the roof top units. Show how the unit is to be mounted on the roof. Reference Section 302.1, IMC 2003.
2. Show the routing and termination of the condensate drain (i.e. show the location and describe the nature of the "landlord provided roof condensate drain"). Reference Section 307.2, IMC 2003 and Section 807.2, UPC 2003.
3. Recirculation of ventilation air from toilet rooms is prohibited. Reference Table 403.2.1 (3), IMC 2003.
08/01/2006 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Needs Review
08/01/2006 ROBERT SHERRY WATER REVIEW Approved
08/01/2006 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. The temperature and pressure relief piping shall not terminate into a water heater pan. Reference section 508.5, UPC 2003.
2. Provide information to show that the proposed location of the thermal expansion tank complies with the manufacturer's listing information. Reference Section 301.1.1, UPC 2003.
3. Provide a vacuum relief for storage-type water heaters located above any fixture outlets. Reference Section 608.7, UPC 2003.
4. Provide an upper terminal cleanout at the mop sink. Reference Section 707.4, UPC 2003.
5. The maximum flow rates for plumbing fixtures shall be consistent with ARS Title 45, Chapter 1, Article 12. See text at: (http://www.azleg.state.az.us/ArizonaRevisedStatutes.asp). Reference Section 402.1, UPC 2003, as amended by the State of Arizona.
6. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference Section 414.1, UPC 2003 and Section 804.3, IECC 2003.
08/01/2006 PATRICIA GILBERT ENGINEERING REVIEW Approved
08/03/2006 JWILLIA5 BUILDING-COMMERCIAL REVIEW Needs Review
08/03/2006 MARTIN BROWN FIRE REVIEW Approved Existing sprinklers are 8.0 "K" factor, not 5.6 as indicated on general notes regarding fire protection.
08/04/2006 JMORALE1 WWM REVIEW Needs Review
08/04/2006 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review