Permit Review Detail
Review Status: Completed
Review Details: POST 3RD PARTY REVIEW
Permit Number - T06CM04349
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/02/2007 | BETSY COTTLE | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | impact fees do apply, development plan D06-0032 was submitted after deadline eastern district 33,351 sf office $78,825.06 |
| 01/05/2007 | PATRICIA GILBERT | ENGINEERING | REVIEW | Denied | Prior to building approval a site application card (yellow card) with the CDRC approved development plan must be stamped with signatures for DSD site approval by the following reviewing sections; Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO. Provide two copies of the approved development plan (approved for site plan approval), landscape and NPPO plans with the approved building plan set. The development plan may be walked through for stamps and site card sign off. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. |
| 12/14/2006 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 12/15/2006 | DAVE MANN | FIRE | REVIEW | Denied | A fire sprinkler system is required per IBC and IFC Sections 903.2.10.3 as amended. Please add the following automatic sprinkler criteria to the plans: 1. The hazard classification of the occupancy including any special hazards. 2. The design standard to be used. 3. The availability and adequacy of the water supply. 4. The design density and the area of operation. |
| 12/19/2006 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: First Magnus Federal Bank Kolb and Tanque Verde T06CM04349 Building Plan (1st Review) TRANSMITTAL DATE: December 19, 2006 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped sit/development, landscape, and NPPO plans with the next building plan submittal. See comment 4. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site/development plan. Additional comments may be forthcoming. 4. A site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the building plan can be approved by Zoning. Two copies of the approved site/development plan, landscape and NPPO plans are to be submitted with the building plans packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The development plan may be walked through for stamps and site card sign off. Submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the site plans packet processed together for site approval. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 791-5608 ext. 1180. C:\planning\building\t06cm04349.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Approved site plan and additional requested documents |
| 12/20/2006 | GERRY KOZIOL | WWM | REVIEW | Denied | needs to show location/method of connection to public sewer |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/29/2007 | FSANCHE1 | OUT TO CUSTOMER | Completed |
| 01/29/2007 | SUE REEVES | REJECT SHELF | Completed |