Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T06CM04263
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/04/2006 | WILDAN | 2ND PARTY REVIEW | REVIEW | Denied | October 4, 2006 City of Tucson Development Services 201 N. Stone Avenue Tucson, AZ 85701 RE: LOCHRIN RESIDENCE – 2nd REVIEW CITY OF TUCSON LOG NO. T06CM04263 WILLDAN PROJECT NO. 13881-6044 The second review for the above project has been completed. This letter contains comments which need to be addressed by written responses to each which indicate any actions taken. In order to facilitate a shorter third review, all corrections and revisions must be made on the original plans and two complete new sets of prints, along with one complete redlined set, must be returned to our office. To avoid delays, ensure that all corrections have been made, are complete, and have been coordinated on all applicable detail and note sheets, and that all changes have been highlighted with appropriate revision numbers, revision dates, and “cloud bubbles.” Pen or pencil corrections on final prints are not acceptable. This project has been reviewed for conformance with the 2003 IRC, 1997 UAC, 2003 IMC, 2003 IECC, 2002 NEC codes with local modifications, and the 2003 UPC with State of Arizona Amendments. Any revisions to this plan will require an additional review and approval by Willdan. Should you have questions regarding the comments herein, please contact your plans examiner Antonio Moya. Occupancy Occup. Load Construction Area S.F. Sprinklered Alarms SFR Porch N/A V-B 2366 102 No Smoke Special Inspection is required for the following items: Welding High strength bolting Epoxy anchors The following items are acceptable for deferred submittals: Trusses ARCHITECTURAL COMMENTS: Reviewed and accepted. STRUCTURAL COMMENTS: Sheet S0.1 Please provide special inspection certificate for welding, high strength bolting, and epoxy anchors. Reference the City of Tucson Submittal Requirements. COMMENT REMAINS: If high strength bolting and welding is going to be substituted, plans need to be resealed by the Engineer of Record and specified how it will be substituted. A Special Inspection is still required for the epoxy bolts. Reference IRC Section 106.1.1 and the City of Tucson Submittal Requirements. PLUMBING COMMENTS: Sheet MP1 Waterline: Provide the total fixture unit demand (based on Tables 6-4 & 7-3 or Tables L-1 & L-2) and the maximum developed length. Reference UPC Section 610. COMMENT REMAINS: Not addressed. MECHANICAL COMMENTS: Sheets M1, MP1, and MP2 Note on plans: “Mechanical shall comply with 2003 IRC Chapters 12-24.” Reference IRC Section M1201.2. COMMENT REMAINS: Not addressed. The note is written addressing the 2003 IRC Plumbing Code. Please revise comment. ELECTRICAL COMMENTS: Sheet E2 Where ceiling fans are shown on the plans, provide a note indicating only approved outlet boxes shall be used. Reference IRC Section E4001.6. COMMENT REMAINS: Not addressed. ENERGY CODE COMMENTS: Reviewed and accepted, ACCESSIBILITY COMMENTS: Reviewed and accepted. Sincerely, WILLDAN Martin Haeberle, C.B.O. Building Official MAH/tb |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/09/2006 | VFLORES1 | OUT TO CUSTOMER | Completed |
| 10/09/2006 | VFLORES1 | REJECT SHELF | Completed |