Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL BLDG/WWM
Permit Number - T06CM03643
Review Name: RESIDENTIAL BLDG/WWM
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/18/2006 | GERRY KOZIOL | WWM | REVIEW | Denied | need DEQ approval- greywqater notes drawings- location of diversion valve may not accomplish whqat is required by DEQ. (needs DEQ approval prior to wastewater approval) |
09/25/2006 | DANIEL RUSCH | BUILDING-RESIDENTIAL | REVIEW | Denied | PLAN REVIEW COMMENTS for Activity # T06CM03643 #2 Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back check time, we request that you please provide revised plans and calculations, highlighting any changes, along with a written response to each of the noted items indicating action taken. SCOPE OF REVIEW: The scope of this plan review covers architectural, plumbing, mechanical, energy conservation and electrical. All code references are to the 2003 International Residential Code, 2003 International Energy Conservation Code, and Arizona State amendments to the 2003 Uniform Plumbing Code. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. GENERAL REQUIREMENTS: All corrections and revisions shall be made on original tracings or finished reproducible set. Return this set and a copy along with a set of the first submission. Pen or pencil corrections on final prints will not be acceptable. To avoid delays, ensure that all corrections have been made, are complete, and have been coordinated on all applicable detail and note sheets. FLOOR PLANS: 1. Show compliance with R303.1 providing natural ventilation for adjacent rooms (4%), or approved mechanical ventilation. Sitting room doesn't have 50% opening to qualify as adjoining room. An openable door doesn't qualify for providing natural ventilation. STRUCTURAL PLANS: 1. Please specify thickness of T1-11 roof sheeting. Per R 803.1 roof sheating should be 5/8" minimum@ 24" on center. PLUMBING PLANS: 1. Your fixture counts are still per 1994 UPC ELECTRICAL PLANS: 1. Branch circuits supplying the bathroom receptacles shall have no other outlets. E3603.4 You still indicate circuit 29 @ exterior outlet and bar sink area. If you have any questions, please contact your assigned plans examiner DANIEL RUSCH at 791-5550, extension 1113. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/03/2006 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
10/03/2006 | SUE REEVES | REJECT SHELF | Completed |