Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T06CM03567
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/15/2006 | TERRY STEVENS | ZONING | REVIEW | Approved | |
| 06/15/2006 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 06/15/2006 | SUZANNE BOHNET | ENGINEERING | REVIEW | Approved | |
| 06/16/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T06CM03567 6/16/06 1. Provide a circuit for the Water Heater. Reference Sheet P1.1. 2. Electric Lighting Plan shows a fused disconnect for the Water Heater. Note indicates that this is a J-box. Please clarify. Reference NEC 420 Part III. 3. Please change the wording in the Note on Sheet E1.1 from "NEC SEC 517.12" to "NEC 517.13." 4. Complete the panel schedule loads and load calculations. Account for all existing and new electrical loads. Demonstrate that no single phase is overloaded. Load calculations at bottom do not include existing lighting, Ex. Tele. Term., Exist. Water Cooler, Existing Refrigerator, Exist Autoclave. 5. Demonstrate that the electrical service is not overloaded. 5. It appears the Circuit 11 should be counted at 919 VA, not 600. 6. Circuit 20 has 1440 VA, not 360. |
| 06/16/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide smoke detectors in the return air duct, upstream of any outside air connections, for all air distribution systems with a capacity greater than 2,000 CFM. Reference Section 606.1, IMC 2003. 2. Provide specifications and operating parameters for the exhaust fans, EF-1 and EF-2. |
| 06/16/2006 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | 1)PROVIDE ACCESSIBILITY EACH RESTROOM PER ANSI A117.1 2003. 2) CLARIFY DIMENSIONS FOR TWO DOOR IN A SERIES PER ANSI A117.1 2003. 3) RECEPTION COUNTER PROVIDE PER ANSI A117.1 2003 904.3. |
| 06/16/2006 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 06/16/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The water pipe sizing is not supported by the pressure calculations. Revise the pipe sizing per Section 610.1, UPC 2003. 2. Revise the termination height of the T&P relief pipe to comply with the requirements of Section 608.5, UPC 2003. 3. A vent pipe shall not be used as a waste pipe (e.g. the condensate drain). Reference Section 311.4, UPC 2003. 4. Provide cleanouts for the building drain serving the back-to-back P-3 sinks sized per Section 707.11, UPC 2003. |
| 06/16/2006 | DAVE MANN | FIRE | REVIEW | Approved | |
| 06/20/2006 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |