Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T06CM03356
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/02/2006 | HEATHER THRALL | ZONING | REVIEW | Denied | Zoning will review this building once the site plan has been approved. A counter review is possible. Please include a copy of the approved site plan in with the building plans set when it is returned for review. |
| 11/03/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Include the water piping to the restrooms in the water supply isometrics. Reference Section 103.2.3, UPC 2003. 2. Detail 5/P2.0 shows how the seismic straps are affixed to the wall but there are no details showing how the water heater shelf is capable of supporting the water heater. Reference Section 103.2.3, UPC 2003. 3. Indicate the maximum temperature setting of the hot water supply to the public lavatories so that the contractor can make the appropriate adjustment to the lavatory faucets. Reference Section 414.1, UPC 2003 and Section 804.3, IECC 2003. 4. Provide listing information for the shower control valve that shows that it complies with the requirements of Section 420.0, UPC 2003, and specifically ASSE 1016. 5. Provide the dimensions for the heat traps shown on detail 4/P2.0. Reference Section 804.4, IECC 2003. 6. Revise the design of the roof drain and overflow drain shown on P1.0 to comply with the requirements of Section 1101.11.2.1, UPC 2003 (the overflow drain shall be the same size as the roof drain). Revise detail 1/A4.0 to comply with the requirements of Section 1105.2, UPC 2003. Clarify how and where the roof drain and overflow drain are to be terminated. Reference Section 1106.0, UPC 2003. |
| 11/06/2006 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 11/06/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
| 11/20/2006 | GERRY KOZIOL | WWM | REVIEW | Denied | NEEDS WASTEWATER 8TH FLOOR CREDIT EVALUATION. |
| 11/21/2006 | LEERAY HANLY | BUILDING-COMMERCIAL | REVIEW | Denied | 1) Reference previous rejection note S23. New detail 24/A9.0 is unclear about bottom flashing for mositure weep and does not indicate how veneer is tied to building per chapeter 14 of IBC. 2) Reference previous rejection notes S26, S27, deferred submittal items must be approved by acting building official Steve Long. Plans should indicate that erection of canopy, metal decking, and 'C' joists shall not commence until all deferred submittal items are approved. |
| 11/28/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. Specify conduit type and routing for Service Area, Equipment Area, and Janitor closet, such that Electrical Plans Examiner may determine compliance with NEC 511.4 (A) and 501.4 (B) (1). 2. Specify the height for the Water Heater Disconnect. Reference NEC 511.4 (B). 3. Demonstrate compliance with NEC 511.7 (B) (1) (b). 4. Either provide the seals required by NEC 511.9 and 501.5 (B), or satisfy the conditions of Exception #1 by adjusting equipment mounting heights in General Note 8, Sheet E2.0. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/28/2006 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
| 12/28/2006 | SUE REEVES | REJECT SHELF | Completed |