Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T06CM03339
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/06/2006 | PETER MCLAUGHLIN | ZONING | REVIEW | Approved | |
06/06/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide justification for ventilating an art studio as an office. 2. Clarify the status of the heat pump: existing or new; what are the electrical requirements? |
06/06/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T06CM03339 6/6/06 1. Clarify status of heat pump. Panel schedule designates it as existing, but from the remainder of the plans this appears to be a new unit. 2. Clarify power requirements of heat pump. Schedule on Sheet M0.1 specifies an MCA of 75A. Yet the HP is protected by a 60A breaker. This would not be a circuit of sufficient size if the MCA data were correct. 3. Provide electrical line diagram of service and all panels on service. 4. Provide service load calculations. 5. Show location of electrical service on scaled drawing. 6. Provide fault calculations for New Panel A. |
06/06/2006 | ROBERT SHERRY | WATER | REVIEW | Approved | |
06/06/2006 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | 1) PROVIDE EXTERIOR WALL SECTION FOR REPLACEMENT OF STOREFRONT. 2) CLARIFY ADJACENT TENANT OCCUPANCY. |
06/06/2006 | PATRICIA GILBERT | ENGINEERING | REVIEW | Approved | |
06/06/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The controlling code is the 2003 UPC with COT amendments, not the IPC. 2. Water pressure in excess of 80 PSI necessitates a pressure regulator. If Table 6-5 is to be used for sizing the water pipes, refer to the last sentence in Section 608.2, UPC 2003. 3. Coordinate the fixture tag numbers in detail C2/P1.1 with the fixture schedule. 4. What is the "approved manner" of anchoring the water heater support to the wall? |
06/07/2006 | DAVE MANN | FIRE | REVIEW | Approved | |
06/14/2006 | AKLAPPE1 | WWM | REVIEW | Needs Review |