Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T06CM02884
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/16/2006 | HEATHER THRALL | ZONING | REVIEW | Approved | |
05/16/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Provide information on the sequence of operation for the restroom exhaust to show that recirculation of the air from the restroom will not occur. Reference Section 403.2.1, IMC 2003. |
05/16/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
05/16/2006 | ROBERT SHERRY | WATER | REVIEW | Approved | |
05/16/2006 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Approved | |
05/16/2006 | ANY | ENGINEERING | REVIEW | Approved | |
05/16/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference Section 414.1, UPC 2003 and Section 804.3, IECC 2003. 2. Show how the new water piping relates to the existing water supply system and show that the additional connections do not cause the existing piping to be overloaded. Reference Section 101.5.1, UPC 2003. |
05/16/2006 | DAVE MANN | FIRE | REVIEW | Approved | |
05/23/2006 | GERRY KOZIOL | WWM | REVIEW | Approved |