Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T06CM02867
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/15/2006 | HEATHER THRALL | ZONING | REVIEW | Approved | |
| 05/15/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Clarify the termination of the condensate drain for HP-4; there is no lav in the area shown. 2. Revise the outside air calculation for HP-3 per Equation 4-1, Section 403.3.2, IMC 2003. 3. Show how recirculation of the air from the restrooms is to be prevented. Reference Section 403.2, IMC 2003. 4. Show that the roof structure is able to support HP-4. |
| 05/15/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Show how the water heater is the be adequately blocked and anchored to the wall. 2. The minimum insulation for recirculating hot water systems is 1". Reference Section 804.5, IECC 2003. |
| 05/15/2006 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 05/15/2006 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 05/15/2006 | SUZANNE BOHNET | ENGINEERING | REVIEW | Approved | |
| 05/18/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | INCOMPLETE O/C REVIEW. OK TO SUBMIT OR TRY AGAIN TOMORROW MORNING. SHEET E1.02 NEEDS REVIEW. T06CM02867 5/18/06 1. New HVAC is protected by a 60A CB on electrical, but the Mechanical Schedule calls for MOCP 30. It appears that Electrical is considering this as a larger unit than does Mechanical. 3. Show windows shall be counted at 200 VA per LF. Reference NEC 220.12 (A). Ckts R-9, T-15B and S-15. |
| 05/18/2006 | GBONILL1 | WWM | REVIEW | Needs Review | |
| 05/18/2006 | GBONILL1 | BUILDING-COMMERCIAL | REVIEW | Needs Review |