Permit Review Detail
Review Status: Active
Review Details: COMMERCIAL TI
Permit Number - T06CM02634
Review Name: COMMERCIAL TI
Review Status: Active
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/04/2006 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
| 05/04/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the roof top units. Reference Section 302.1, IMC 2003. 2. If there is no surrounding parapet, provide guards for equipment located within 10 feet of a roof edge or of a walking surface that is elevated more than 30 inches above the adjoining grade. Reference Section 304.10, IMC 2003. 3. Show how the specified heat pumps are capable of maintaining a minimum temperature of 68°F in the main hall on a design heating day (32°F). Reference Sections 309.1 and 312.1, IMC 2003. 4. Clarify the termination point of the condensate drain: does the area absorb the condensate? Reference Section 307.2.1, IMC 2003, as amended by the City of Tucson. 5. Provide justification for the occupant load used to calculate the required amount of outside air. Reference Section 403.3, IMC 2003. 6. Specify the minimum resistance (R-value) of the duct insulation to be used on this project. Reference Section 803.2.8, IECC 2003. |
| 05/04/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T06CM02634 5/3/06 1. Provide power for EF-1 and EF-2. Reference Sheets M.1 and M.2. 2. Please eliminate the redundant GND in the conduit between the CT Can and new Disconnect. Reference NEC 250.24. 3. TEP does not publish AFC for single phase services. However, SR-510, Revision 7, states that 22,000 AFC will be maintained as a maximum for residential services when practicable. This not being a residential service, please contact TEP for AFC. Otherwise, rate all new equipment for 22K and add the following note on the plans: "Contractor to verify Available Fault Current with TEP. Do not install equipment above its fault current rating." |
| 05/04/2006 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 05/04/2006 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | 1) JUSTIFY / CLARIFY OCCUPANT LOAD AND EXITING. 2) MEETING ROOM LAST APPROVED AS A STORAGE ROOM. NEEW OCCUPANCY NEEDS TO BE JUSTIFIED. 3) PROVIDE STRUCTURAL CALCULATIONS JUSTIFYING LINTELS. CLARIFY OPENING SIZE. 4) JUSTIFY WITH STRUCTURAL CALCULATIONS THAT EXISTING STRUCTURE CAN CARRY THE NEW LOAD OF HVAC EQUIPMENT. 5) JUSTIFY PLUMBING FIXTURE AMOUNTS FOR OCCUPANT LOAD. 6) PROVIDE ACCESSIBILITY FOR THE ACCESSIBLE ROUTE FROM THE PARKING LOT TO ALL PUBLIC ROOMS INCUDING THE RESTROOMS. |
| 05/04/2006 | ANY | WWM | REVIEW | Active | |
| 05/04/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
| 05/04/2006 | ANY | ENGINEERING | REVIEW | Active | |
| 05/04/2006 | ANY | FIRE | REVIEW | Active |