Permit Number: T06CM02533
Parcel: 10321029Y

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T06CM02533
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/29/2006 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied Second request. Show how storm water drainage from the parking structure is to be accomplished. Keynote 16, sheet 2 of 2 of the site plan shows two deck drains but references the architectural drawings for details. Sheet A0.0, in turn, shows the location of the two deck drains but has no details, only a reference to the civil plans. Provide a design for the deck drainage including the size, routing, and termination of the drain leaders. Indicate how the existing parking lot will drain after the construction of the new parking space. Reference Section 1101.1, UPC 2003.
10/02/2006 BETSY COTTLE COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
10/04/2006 STEVE SHIELDS ZONING REVIEW Denied DSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: MOSAIC CAFÉ PARKING
2456 N. Silver Mosaic
T06CM02533
Building Plan

TRANSMITTAL DATE: October 6, 2006

1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan at this time.

2. Zoning could not verify that the building plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next building plan submittal.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming.

If you have any questions about this transmittal, please call Steve Shields,
(520) 791-5608 ext. 1180.

C:\planning\building\t06cm02533.doc


RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Approved and stamped site plan and additional requested documents
10/05/2006 DOUG LAAKSO BUILDING-COMMERCIAL REVIEW Denied .. T06CM02533 .. 2456 NORTH SILVER MOSAIC DRIVE .. MOSAIC CAFÉ PARKING STRUCTURE .. DGL .. 2nd REVIEW COMMENTS .. 10/5/06 ..

TRANSMIT PRIOR SUBMITTAL/S WITH NEXT SUBMITTAL.

S1. See prior comment #S1. (S1. Provide complete set of sealed and signed drawings for final permit review and approvals, ref DCC 1 of 2 and 2 of 2.)
S2. See prior comment #S8. Provide requested information on the drawings. (S8. Provide on-hour minimum fire-rated wall at property line per IBC Section 406.3.7, tables 601 and 602,Section 704, fully design and detail Architecturally and Structurally, provide copy of fire listing and fire-rated construction details on the drawings.)
S3. See prior comment #S10. Show location of complying address signage. (S10. Show on drawing A0.0 the location, size and material of address complying with Pima County Addressing Ordinance and Premises Identification per IBC Section 502.2.)
S4. See prior comment #S12. Please complete this information on Code Review Checklist. (Provide completed Area Modification calculation per IBC Section 506 and Code Review Checklist, ref T0.0.)
S5. See prior comment #S13. Show required fire data and details on the drawings. (S13. Show on drawings the fire-rating requirements of Type IB construction and indicate on drawings by copy of fire listing, construction materials and details how required fire-ratings for building elements are to be accomplished per IBC Section 6 and 7 and T0.0.)
S6. See prior comment #S16 and #S1 above. (S16. Address drainage of this structure, per IBC Section 15, provide adequate spot elevations so structure can be located vertically ref: drawings A0.0, DCC 1of 2 and DCC 2 of 2.)
S7. See prior comment #S17. (S17. Address accessibility per IBC Section 3409, show where 20% of the project cost is spent on accessibility for the Site , including the existing Café.)
S8. See prior comment #S18 and #S1 above. (S18. Show locations for curb access ramps as well as required landings at top and bottom of curb access ramps, provide adequate finished grade spot elevations to address accessibility: ref, drawings A0.0, DCC 1 of 2 and 2 of 2.)
S9. See prior comment #S22, as revised. (S22. Submit two sets of shop drawings and calculations, stamped and signed by an Arizona Registered engineer, shop drawings shall be reviewed by and bear the approval of the Engineer or Architect of Record prior to submission to the City of Tucson, Development Services Department for approval prior to erection for:
1. Precast concrete beams.
2. Precast concrete columns.
3. Precast concrete slabs.
4. Precast concrete tees.
5. Lightpole.
6. Guard.
7. Vehicle Barriers per IBC Section 406.2.4.)
S10. See prior comment #S23. (S23. Provide Inspection Program per 1997 Uniform Administrative Code Section 302.5.)


Questions? Call Christy Foreman Structural Plans Examiner for the City of Tucson Development Services Department at (520) 791-5550 x1108 or visit City of Tucson , DSD website : www.tucsonaz.gov/dsd.
10/09/2006 BOB SUBA ELECTRICAL-COMMERCIAL REVIEW Approved
11/07/2006 JASON GREEN ENGINEERING REVIEW Denied All comments for Engineering will be posted on the Site Plan review folder. JG 11-07-06

Final Status

Task End Date Reviewer's Name Type of Review Description
02/08/2007 GERARDO BONILLA OUT TO CUSTOMER Completed
02/08/2007 SUE REEVES REJECT SHELF Completed