Permit Number: T06CM02533
Parcel: 10321029Y

Review Status: Completed

Review Details: COMMERCIAL NEW

Permit Number - T06CM02533
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/01/2006 MARTIN BROWN FIRE REVIEW Approved
05/03/2006 RBABBIT1 LANDFILL REVIEW Approved
05/08/2006 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied Show how storm water drainage from the parking structure is to be accomplished. Reference Section 1101.1, UPC 2003.
05/08/2006 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Passed
05/08/2006 ROBERT SHERRY WATER REVIEW Approved
05/10/2006 GERRY KOZIOL WWM REVIEW Passed
05/12/2006 BOB SUBA ELECTRICAL-COMMERCIAL REVIEW Denied 1.Provide fixture cut sheets on all outdoor fixtures. 2.See attached sheet for electric permit requirements.(See and address all high lighted comments.)
05/26/2006 DOUG LAAKSO BUILDING-COMMERCIAL REVIEW Denied .. T06CM02533 .. 2456 NORTH SILVER MOSAIC DRIVE .. MOSAIC CAFÉ PARKING STRUCTURE .. DGL .. 1ST REVIEW COMMENTS .. 6/6/06 ..

TRANSMIT PRIOR SUBMITTAL/S WITH NEXT SUBMITTAL.

S1. Provide complete set of sealed and signed drawings for final permit review and approvals, ref DCC 1 of 2 and 2 of 2.
S2. Provide completed Code Review Checklist, as required by 1997 Uniform Administrative Code Section 302.1, including: Summary of Governing Regulations, General Building Summary and Allowable Area Calculation.
S3. Indicate clear height, on drawings, per IBC Section 406.2.2.
S4. Clarify Guards required on drawings, per IBC Section 406.2.3.
S5. Show on drawings and provide required calculations and details for Vehicle Barriers, per IBC Section 406.2.4.
S6. Show on drawings Vehicle Ramps per IBC Section 406.2.5.
S7. Show on drawings Floor Surface per IBC Section 406.2.6, including materials and slopes.
S8. Provide on-hour minimum fire-rated wall at property line per IBC Section 406.3.7, tables 601 and 602,Section 704, fully design and detail Architecturally and Structurally, provide copy of fire listing and fire-rated construction details on the drawings.
S9. Provide and show design and details, on drawings, for Means of egress per IBC Section 406.3.8 meeting requirements of IBC Section 10.
S10. Show on drawing A0.0 the location, size and material of address complying with Pima County Addressing Ordinance and Premises Identification per IBC Section 502.2.
S11. Explain on drawings how the two building on the same lot are designed to be regulated per IBC Section 503.1.3, if the are to be reviewed as two separate buildings show imaginary property lines on drawing A0.0.
S12. Provide completed Area Modification calculation per IBC Section 506 and Code Review Checklist, ref T0.0.
S13. Show on drawings the fire-rating requirements of Type IB construction and indicate on drawings by copy of fire listing, construction materials and details how required fire-ratings for building elements are to be accomplished per IBC Section 6 and 7 and T0.0.
S14. Provide architectural floor plan for both levels of structure.
S15. Show occupant load on drawing A0.0, per IBC Section 1004.
S16. Address drainage of this structure, per IBC Section 15, provide adequate spot elevations so structure can be located vertically ref: drawings A0.0, DCC 1of 2 and DCC 2 of 2 .
S17. Address accessibility per IBC Section 3409, show where 20% of the project cost is spent on accessibility for the Site , including the existing Café.
S18. Show locations for curb access ramps as well as required landings at top and bottom of curb access ramps, provide adequate finished grade spot elevations to address accessibility: ref, drawings A0.0, DCC 1 of 2 and 2 of 2.
S19. Provide copy of soils report of record for plan review and records.
S20. Provide architectural, civil and structural details at southwest corner of deck and slab to clarify how construction takes place there, ref drawings A0.0, DDC 2 of 2 and S3.1.
S21. Explain in structural calculations how surcharge from parking is accounted for in design of this structure, address grade beams, columns and structure as a whole, because of lack of lateral support /slope.
S22. Submit two sets of shop drawings and calculations, stamped and signed by an Arizona Registered engineer, shop drawings shall be reviewed by and bear the approval of the Engineer or Architect of Record prior to submission to the City of Tucson, Development Services Department for approval prior to erection for:
1. Precast concrete beams.
2. Precast concrete columns.
3. Precast concrete slabs.
4. Precast concrete tees.
5. Lightpole.
6. Guard.
S23. Provide Inspection Program per 1997 Uniform Administrative Code Section 302.5.
S24. Special inspection required for:
1. Caissons.
2. Soils.
3. Concrete.
4. Reinforcing.
5. Precast concrete slabs, tees, columns and beams.
6. Prestressing tendons.
7. Field welding.
8. Epoxy anchors.
9. Expansion anchors.
10. Erection of precast members.
11. Anchors and embedments in concrete.

Questions? Call Douglas Laakso Structural Plans Examiner for the City of Tucson Development Services Department at (520) 791-5550 x1111, email at <Doug.Laakso@tucsonaz.gov.> or visit City of Tucson , DSD website : www.tucsonaz.gov/dsd.
06/07/2006 PETER MCLAUGHLIN ZONING REVIEW Denied An approved site plan is required.
06/08/2006 JASON GREEN ENGINEERING REVIEW Denied DATE: June 20, 2006
SUBJECT: New Parking Structure for Mosaic Cafe
TO: Maria Rojas
LOCATION: 2625 N Silverbell Rd, T13S R13E Sec33, Ward 1
REVIEWERS: Jason Green, CFM
ACTIVITY: T06CM02533


SUMMARY: Engineering Division of Development Services Department has received and reviewed the submitted site plan, landscape plan and drainage report. The drainage report was reviewed for site plan purpose only. The site plan is not approved at this time. Please address the following comments:


DRAINAGE REPORT:

1) DS Sec.10-02.2.3.1.2.D: Provide a copy of the previous drainage report referenced in the Detention/Retention section of this proposed report titled, "Drainage Report for Silverbell Road & Ironwood Hill Drive Property" by Rick Engineering Company.

2) DS Sec.10-02.2.3.1.5.C: Provide hydraulic calculations for the basin outfall weir and provide any necessary outlet protection if applicable.

3) DS Sec.10-02.2.3.1.6.A.4.a: Revise the drainage report with a submitted site plan which clearly shows the location, size, dimensions and elevations for the basins existing outfall pipe and outfall weir that are referenced in the Detention/Retention section of the proposed drainage report.

4) DS Sec.10-02.2.3.1.6.A.4.f: Provide on the revised site plan the location and type of security barriers that are to be installed around the basin. Include a discussion on how the security barriers will prevent transient activity, trespassing issues and safety hazards.

5) DS Sec. 3-01.4.4.F: Provide a revised drainage report showing scupper calculations that demonstrate that the 10-year flood flow from the roof drainage is contained under the sidewalk. Provide details and dimensions in plan view for any proposed scuppers.


SITE PLAN COMMENTS:

6) DS Sec.2-02.2.1.A.20: Review of the site plan shows utility easements that fall in the location of the proposed parking structure that may have maintenance access obstruction issues with the proposed improvements. Obtain a letter from each entity having a recorded interest in all easements, as shown on the proposed site plan that will be obstructed by the construction of the proposed elevated parking structure. Each entity must provide a letter stating that they do not have any issues with the proposed parking structure being constructed over the existing easements.

7) DS Sec.2-02.2.1.8: Revise the entire existing parking lot and parking area access lanes (PAAL) to bring them into full code compliance. Per Tucson Code 25-39 the maximum number of driveways per 100 feet of frontage road is 2. Currently there are 3 driveways along N Silver Mosaic Drive. Please refer to Sec 25-39 of the Tucson Code and Development Standard Sec.3-05 for all specifications and restrictions for redesigning the parking area and PAALs.

8) DS Sec.3-05.2.2.2.D: Revise the back-up spur provided at the end of the PAAL on the proposed elevated parking structure. The spur must be a minimum of 3 feet in depth with a 3-foot radii, but must also provide a minimum of 3 feet between the back of spur and any wall obstruction that is over 6 inches in height.

9) DS Sec.2-02.2.1.A.10: Revise the sight visibility triangles on Sheet 2 of 2. Specifically revise the near side length to read 185 feet and the far side length to read 110 feet. The proposed site plan shows the sight visibility triangles reversed in plan view. Refer to DS Sec3-01.5.1 for sight visibility triangle procedures and criteria. Also revise the landscape plan to reflect the sight visibility triangles shown on the site plan.

10) DS Sec.2-02.2.1.A.12: Revise Sheet 2 of 2 to label the continuous pedestrian circulation path that connects all public access areas of the existing building and the proposed circulation path located on N Silver Mosaic Drive.

11) DS Sec.2-02.2.1.A.14: Provide the required maneuvering area for the loading zone that will be shown on the revised site plan. Refer to AASHTO for the national standards for turning radii.

12) DS Sec.2-02.2.1.A.15: Revise the site plan to provide the limits of the 100-year floodplain and water surface elevations within the existing basin.

13) DS Sec.2-02.2.1.A.16: Provide a detail for any proposed scuppers, which are used for collecting onsite roof drainage at all pedestrian sidewalks. Any scupper proposed under the sidewalk will be designed and constructed to convey the 10-year flood flow. Provide a revised drainage report showing scupper calculations that demonstrate that the 10-year flood flow is contained under the sidewalk.

14) DS Sec.2-02.2.1.A.23: Revise the site plan so that the shaded area referencing the proposed elevated parking structure is readable. The shaded area needs to be lightened up so that existing topography, spot elevations, and details of the structure can be seen.

15) DS Sec.2-02.2.1.A.29: Revise the site plan to include the correct site plan number (T06CM02533) in the lower right hand corner of the plans where indicated by "T06CMXXXXX".

16) DS Sec.2-02.2.1.A.31: Provide on the revised site plans the Scenic Corridor overlay Zone. The overlay zone must be approved prior to site plan approval.

17) DS Sec.2-02.2.1.A.32: Provide dimensions for refuse container, show or label gates or doors for trash enclosures. The property is subject to full code compliance therefore all aspects of the site plan must be brought up to current development standards. The enclosure must have a minimum inside clear dimension of 10 feet by 10 feet between bollards that are required between the container and the enclosure's rear and sidewall. Refer to DS Sec.6-01.4.2 for specifications and requirements on access, placement of containers, bin enclosure and construction. Show maneuverability for refuse vehicles in plan view.

18) DS Sec.2-01.2.1.C: Revise the landscape plan to reflect the revised sight visibility triangles that are shown on the site plan. Provide a note on the landscape plan to state no structures and vegetation is allowed within 30" to 72" in height and will not be placed within the sight visibility triangles. Remove any proposed vegetation within the sight visibility triangle areas that obstructs sight visibility.

19) Provide construction easements on the site plan for construction of the columns and/or caissons along the slope access. The construction easements must be provided along with recordation information for the easements that adjacent property owners have granted access for construction vehicles across their property.


GEOTECHNICAL REPORT:

20) DS Sec.10-01.III.3.5.1.3.a, 10-02.14.2.6: A geotechnical evaluation needs to be submitted for review, addressing the following:

a) Soils report should provide conformance with DS Section 10-02.14.2.6 regarding 30-foot boring for the basin, and provide discussion of potential for hydro-collapsible soils and any recommendation for setbacks from building to basin and depth of footings for the caissons and concrete columns located in the basin and along the existing natural slope.
b) The soils report shall provide identification / assessment of any potentially hazardous geotechnical areas, and state any geotechnical recommendations and whether there are special provisions for the soil preparation for this development.
c) Provide slope stability recommendations for any proposed constructed slopes.
d) Provide pavement structure design recommendations.


GENERAL COMMENTS:

21) A grading plan will be required for this project. It is not recommended at this time to submit the grading plan until the site plan is further along and the major design issues are resolved. However the geotechnical report will be required at the grading plan submittal for feasibility concerns and isues.

22) Arizona Pollutant Discharge Elimination System (AZPDES) requirements are applicable to this project. Stormwater Pollution Prevention Plans (SWPPP) and text addressing stormwater controls for all areas affected by construction activities related to this development will be required. For further information, visit www.adeq.state.az.us/environ/water/permits/stormwater.html.

Please provide a revised site plan, a revised landscape plan, a revised drainage report, and a geotechnical report that address the comments provided above. Include a comprehensive response letter addressing in detail responses to all of the above comments.

Further comments may be generated upon resubmittal of the site plan, landscape plan, drainage report, and geotechnical report reviews. Please enclose "redlines" with the resubmittal package for reference.

For any questions or to schedule a meeting, call me at 791-5550, extension 1189.


Jason Green, CFM
Senior Engineer Associate
Engineering Division
Development Services

Final Status

Task End Date Reviewer's Name Type of Review Description
06/21/2006 GBONILL1 OUT TO CUSTOMER Completed
06/21/2006 SUE REEVES REJECT SHELF Completed