Permit Review Detail
Review Status: Completed
Review Details: POST 3RD PARTY REVIEW
Permit Number - T06CM02069
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/03/2006 | BETSY COTTLE | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | D06-0004 approved June 2006 no impact fees |
| 10/03/2006 | ROBERT SHERRY | WATER | REVIEW | Denied | 1. Provide a reduced pressure backflow prevention assembly for the water service to the building. Reference Section 27-76, Article V, Chapter XXVII, of the Tucson Code. 2. Clarify the size of the components for the water service to the building. The water calculations on P1 indicate a 1-1/2" water meter and a 2" RPBP but the drawing shows a 1" water meter and no RPBP. |
| 10/03/2006 | MARTIN BROWN | FIRE | REVIEW | Denied | Please indicate location of existing fire hydrants. An on-sight hydrant may be required. |
| 10/06/2006 | GERRY KOZIOL | WWM | REVIEW | Denied | need to build public sewer (need approved public sewer plans & need public sewer construction permit from 2nd floor) need 1st floor DSC/WW hold harmless letter |
| 10/12/2006 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 10/13/2006 | CAGUILA1 | ENGINEERING | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/13/2006 | CINDY AGUILAR | APPROVAL SHELF | Completed |
| 10/13/2006 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |