Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T06CM01995
Review Name: REVISION - - 1ST
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/19/2006 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | 1) Special Inspection certification form for epoxy bolts needs to be submitted before the permit can be issued. 2) Provide floor plan and exterior elevation to locate scope of work. Dimension location of new work on existing building. 3) Provide elevation and section showing specification for installation of tube steel column per the structural calculations. 4) Drawings shall be provided on a minimum of 24" x 36" size sht. with the text hgt. of 1/8" minimum. Structural engineer shall seal and sign the drawings submitted. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/04/2006 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
| 10/04/2006 | SUE REEVES | REJECT SHELF | Completed |