Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T06CM01891
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/26/2006 | HEATHER THRALL | ZONING | REVIEW | Needs Review | ZONING WILL REVIEW THE BUILDING PLAN AT THE COUNTER WITH THE ARCHITECT WHEN THE SITE PLAN COMES BACK IN FOR MINOR REVISIONS. |
| 10/27/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Sign and date the seal on the design documents. Reference Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. 2. The pressure-balanced tub and shower valves must conform to ASSE 1016 to comply with the requirements of Section 420.0, UPC 2003. 3. Provide cleanouts for units 1-6 that comply with the requirements of Sections 707.4 and 707.11, UPC 2003. 4. Coordinate the water riser diagrams for units 1-8 and the call-outs for the plumbing fixtures with the floor plans. Show how the piping relates to the water heater and where the unit piping connects to the building piping. 5. Provide cleanouts for units 7-8 that comply with the requirements of Sections 707.4 and 707.11, UPC 2003. 6. Correct the call-outs for the plumbing fixtures as shown on Detail 1/MP1.3. 7. Remove the valve between the expansion tank and the water heater. Reference Section 608.3, UPC 2003 with local amendments. |
| 10/27/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Sign and date the seal on the design documents. Reference Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. 2. Clarify the notes for the fan coil unit access panel on the second floor mechanical plan for units 7 & 8. |
| 11/06/2006 | BOB SUBA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 11/16/2006 | JOSE ORTIZ | ENGINEERING | REVIEW | Denied | Building Permits will be approved when the Site Plan and Grading Plan have been approved. If you have any questions you may contact me at 791-5640 ext.1191 or Jose.Ortiz@tucsonaz.gov |
| 11/21/2006 | LEERAY HANLY | BUILDING-COMMERCIAL | REVIEW | Denied | PLEASE HAVE ARCHITECT SIGN HIS PLANS, ALSO STRUCTURAL ENGINEER NEEDS TO SIGN STRUCTURAL PAGES. 1) CLARIFY COMPLIANCE WITH ICC A117.1 (ANSI117.1) SECTION 1004.3.1 FOR ACCESSIBLE ROUTE TO BEDROOMS. 2)CLARIFY COMPLIANCE FOR CLEARANCE AT DOORS ON ACCESSIBLE ROUTE PER SECTION 404.2.3.1 OF ICC A117.1. 3) PROVIDE TRUSS SHOP DRAWINGS APPROVED BY A REGISTRANT WITH SUBMITTAL STAMP APPROVAL BY CITY OF TUCSON. MUST BE ISSUED PRIOR TO INSTALLATION. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/16/2007 | GERARDO BONILLA | OUT TO CUSTOMER | Completed |
| 01/16/2007 | SUE REEVES | REJECT SHELF | Completed |