Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T06CM01618
Parcel: 12202014A

Address:
4632 E GRANT RD

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T06CM01618
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/05/2006 DOUG LAAKSO BUILDING-COMMERCIAL REVIEW Denied .. T06CM01618 .. 4632 E GRANT ROAD .. V I P MASSAGE .. DGL .. 1ST REVIEW .. 5/10/06 ..

TRANSMIT PRIOR SUBMITTAL/S WITH NEXT SUBMITTAL.

S1. Provide completed Code Review Checklist, as required by 1997 Uniform Administrative Code Section 302.1, including: General Building Summary and Allowable Area Calculation.
S2. Revise the font size used on the drawings to a minimum of 1/8 inch (all upper case). Reference Section 302.3, Uniform Administrative Code, 1997.
S3. Provide an Official Address Slip from Pima County Addressing for this Tenant Space.
S4. Provide on drawings the location of the address numbers to be installed and show the installed address will conform to requirements of the Pima County Addressing Ordinance and 2003 IBC Section 501.2.
S5. Pima County Health Department approval is required. Call 520 740-8261 for information and requirements.
S6. Provide drawings showing compliance with Tucson Code Article VII. MASSAGE ESTABLISHMENTS, Section 7-137, Items (1) through (12):
[ (1) A readable sign shall be permanently attached and posted at the main entrance identifying the establishment as a massage establishment. The sign shall not be smaller than three (3) inches by five (5) inches and be of a durable material.
(2) Minimum lighting shall be provided in accordance with the Uniform Building Code, and in addition, at least one (1) artificial light of not less than forty (40) watts shall be provided in each room or enclosure where massage therapy is performed on patrons which shall be in operation whenever massage therapy is performed.
(3) Minimum ventilation shall be provided in accordance with the Uniform Building Code. Rooms must have a window that opens and/or a supply and return register.
(4) Adequate equipment shall be provided for disinfecting instruments used in administering or practicing any of the subjects or methods of treatment listed in section 7-131(a).
(5) Hot and cold running water, tempered by means of a mixing valve faucet, shall be provided at all times.
(6) Closed cabinets shall be provided, and used, for the storage of clean linens.
(7) Adequate dressing and toilet facilities shall be provided for patrons. The bathroom must be within the confines of the establishment. One (1) dressing room (may be the same as the massage treatment room), one (1) toilet and one (1) wash basin shall be provided by every massage establishment with one (1) to three (3) treatment rooms. Another toilet and wash basin must be provided when there are four (4) or more treatment rooms in an establishment. A minimum of one (1) shower or tub shall be provided for any establishment offering any hydrotherapy services such as whirlpool baths, saunas, steam baths, herbal wraps, etc. Each dressing room/treatment room shall contain a locker, lock box or cabinet for each patron to be served which shall be capable of being locked.
(8) Any pool or spa shall be permitted and inspected by the county health department.
(9) All walls, ceilings, floors, showers, bathtubs, steam rooms and all other physical facilities within the establishment must be in good repair and maintained in a clean and sanitary condition. Wet and dry heat rooms, steam or vapor rooms, or cabinets, toilets and wash basins shall be thoroughly cleaned each day business is in operation. Shower compartments and bathtubs, where provided, shall be thoroughly cleaned after each use.
(10) Clean and sanitary sheets and towels shall be provided for each patron of the establishment. The head rest or face cradle of each table shall be provided with a clean and sanitary covering for each patron.
(11) All wash basins within an establishment shall have hot and cold running water, tempered by means of a mixing valve faucet; provide sanitary towels placed in permanently installed dispensers or upon a permanently attached roll dispenser; and provide a soap dispenser that is placed on or near the wash basin. A hand wash basin shall be provided in each treatment room providing hydrotherapy services.
(12) In the event that a massage establishment is located in a residence, the following requirements must be met:
a. A separate room that is not used as a living space must be provided.
b. Only one (1) massage treatment room within a residence is permitted.
c. Toilet and wash basin facilities shall be located on the same floor as the massage treatment room and shall be easily accessible to the massage treatment room; no nonresidential plumbing fixtures shall be installed to accommodate this use.
d. Adequate parking shall be available (space for no less than two (2) cars).
e. Full-service hydrotherapy facilities (whirlpool, steam, sauna, etc.), for public use, shall be prohibited.
f. A massage establishment shall be accessible by a separate, outside door (not through the residence). If installation of an outside entrance is necessary, such entrance shall be constructed to the side or back of the residence and conform to all building codes.
g. A massage establishment shall be separated from the residence by complete partitioning and solid, self-closing doors (raised panel doors not acceptable).
h. All other guidelines outlined in this section shall be complied with.
i. Compliance with the home occupation regulations of the Tucson Zoning Code is required.
(Ord. No. 9991, ยง 2, 6-28-04)]
S7. Show location of this building on the site/location plan by dimension from two adjacent property lines and the location of this Tenant Space within the building, by dimension on site/location plan.
S8. COT Records show this building has retail as well as office and perhaps assembly, clarify your separation and allowable area calculation, by showing the tenants names, tenant locations, in the building and provide copies of their valid Certificates of Occupancy.
S9. Show conformance, with IBC and ANSI A117.1-2003ed, on the drawings, including accessible route from the public way, required width for accessible routes, required clear space at doors and fixtures, accessible door hardware, grab bar locations and size, fixture locations and type, accessibility signage and location, accessible massage room, accessible dressing room/shower, accessible laundry room, accessible reception counter, accessible storage room, accessible parking, etc.
S10. Provide detail for attachment of partial height walls to existing walls at intersections.
S11. Provide complete details for installation of shower including the pan and sealing of the pan.


Questions? Call Douglas Laakso Structural Plans Examiner for the City of Tucson Development Services Department at (520) 791-5550 x1111, email at <Doug.Laakso@tucsonaz.gov.> or visit City of Tucson , DSD website : www.tucsonaz.gov/dsd.

Final Status

Task End Date Reviewer's Name Type of Review Description
05/12/2006 ADRIANNE OLIVO OUT TO CUSTOMER Completed
05/12/2006 SUE REEVES REJECT SHELF Completed