Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T06CM01455
Review Name: COMMERCIAL NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/22/2006 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 03/24/2006 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Denied | 1) The allowable soil pressure of 1500 psf is permitted only when plans are accompanied with a soils report or when the footing extends 18 " into undisturbed natural soil. Therefore state on plans that all footings shall extend 18" into undisturbed natural soil. 2) Specify that ledger bolts shall be spaced 12" o.c. or provide engineering calcs. 3) Show all grab bars on all plans. |
| 03/29/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Show how the new water piping relates to the existing water supply system and show that the additional connections do not cause the existing piping to be overloaded. Reference Section 101.5.1, UPC 2003. 2. Provide waste and vent isometrics. Reference Section 103.2.3, UPC 2003. 3. Provide water supply isometrics. Reference Section 103.2.3, UPC 2003. 4. Provide a natural gas piping design for service being relocated, including a natural gas schematic showing the sizes, loads and developed lengths of the piping. Reference Section 103.2.3, UPC 2003. 5. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference Section 414.1, UPC 2003 and Section 804.3, IECC 2003. 6. Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, and valves. Reference Sections 103.2.3, 605.5, and 608.3 UPC 2003. 7. Terminate the pressure relief for the water heater no lower than 6" above the ground. Reference Section 608.5, UPC 2003. 8. If the specified water heater is not supplied with integral heat traps, provide heat traps on the supply and discharge piping. Reference Section 804.4, IECC 2003. 9. Coordinate the electrical requirements for the water heaters with the electrical design. Reference Section 501.0, UPC 2003. 10. The fixture connection sizes called out for the urinal flush valves will result in water velocities greater than 8 FPS. Limit the water velocity to less than 8 FPS for the copper piping. Reference Section A 6.1, UPC 2003 and IAPMO IS 3-2000, Section 610.0. 11. Provide the listing for the two-way cleanout fitting called out in detail 2/P1.1. Reference Sections 103.2.3 and 707.6, UPC 2003. 12. Modify trap arm lengths to conform to Table 10-1, UPC 2003. Reference Section 1002.2, UPC 2000. 13. Provide protection of the trap seals for all floor drains subject to infrequent use. Reference Sections 1007.0 and 1007.1, UPC 2003, with local amendments. 14. Provide roof drainage calculations and plans. Provide overflow protection for the roof. Reference Section 1106.0, UPC 2003. |
| 03/29/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Confirm that only one outdoor unit is required for the heat pumps. Reference Section 106.3.1, IMC 2003. 2. Provide manufacturer's equipment data along with mechanical and electrical operating information for the split-system heat pumps. Reference Section 301.6, IMC 2003. 3. Provide manufacturer's equipment data along with mechanical and electrical operating information for the exhaust fans. Reference Section 301.6, IMC 2003. 4. Ventilation for restrooms in public spaces requires a minimum of 75 CFM of mechanical exhaust per water closet or urinal. Reference Table 403.3, IMC 2003. 5. Provide energy code compliance calculations for the addition to the building. Reference Section 101.4, International Energy Conservation Code 2003. |
| 03/30/2006 | ROBERT SHERRY | WATER | REVIEW | Passed | |
| 04/06/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. Coordinate the electrical requirements for the water heaters with the electrical design. Requirements are for 240V on Water Heater Schedule, but are on 120V power on Panel Schedule. 2. Provide disconnects for the new Water Heaters. Reference NEC 422 Part III. 3. Schedule for Air Conditioner specifies ampacity of 0.5A. This could not be Code-compliant if the circuit breaker is 15A. 4. Provide electrical power for the exhaust fans. 5. Only one exhaust fan is switched. Please clarify. 6. Provide manufacturer's equipment data along with mechanical and electrical operating information for the exhaust fans. 7. Provide a disconnect for AC #4. Reference NEC 440.14. 8. Provide a maintenance receptacle for AC #4. Reference NEC 210.63. 9. Demonstrate compliance with the 2003 IECC for Lighting Power Budget. 10. Specify the fuse for AC #4, as required in the Air Conditioning schedule. 11. Clarify power requirements for Air Conditioner. If minimum ampacity is 25A, it would seem that this unit should be counted at 6000W, not 2400. 12. Add the exhaust fans and the indoor units to the load calculations. 13. The method of calculation using the 40% factor is valid only for Dwelling Units. Reference NEC 220.30. 14. Demonstrate that the electrical service is not overloaded. 15. Provide an electrical line diagram, under the Registrant's own seal. 16. Demonstrate that no phase of Panel A is overloaded. |
| 04/20/2006 | SEPTIC APPROVAL | WWM | REVIEW | Denied | SEPTIC UNDER P06CP03683, NOT YET NOT YET APPROVED |
| 04/27/2006 | MICHAEL ST. PAUL | ZONING | REVIEW | Denied | Please provide a site plan meeting Development Standards requirements (DS 2-02.1.0). Please provide a copy of the last approved site plan. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/08/2006 | ADRIANNE OLIVO | OUT TO CUSTOMER | Completed |
| 05/08/2006 | SUE REEVES | REJECT SHELF | Completed |