Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T06CM01349
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/02/2006 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Approved | |
05/05/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Keynote #7 calls for the removal of specific existing natural gas piping but the piping does not appear on the mechanical plan. |
05/05/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Clarify what is being done with the roof top unit being relocated from K-6 to somewhere off the sheet. Reference Section 106.3.1, IMC 2003. 2. Keynote #3 calls for the removal of an existing evaporative cooler but the cooler does not appear on the mechanical plan. 3. Clarify the termination points of the new condensate drains; are they terminating in an area capable of absorbing the condensate flow without surface flow? Reference Section 307.2.1, IMC 2003, as amended by the City of Tucson. 4. What is the basis for the quantities of outside air being supplied to the relocated rooftop units? Reference Section 403, IMC 2005 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/09/2006 | JMORALE1 | OUT TO CUSTOMER | Completed |
05/09/2006 | SUE REEVES | REJECT SHELF | Completed |