Permit Review Detail
Review Status: Completed
Review Details: POST 3RD PARTY REVIEW
Permit Number - T06CM01276
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/31/2006 | MARTIN BROWN | FIRE | REVIEW | Approved | Please add the following automatic sprinkler criteria to the plans: 1. The hazard classification of the occupancy including any special hazards. 2. The design standard to be used. 3. The availability and adequacy of the water supply. The design density and the area of operation. Also, please show existing fire hydrant location on site plan. |
| 08/02/2006 | ROBERT SHERRY | WATER | REVIEW | Passed | |
| 08/25/2006 | GERRY KOZIOL | WWM | REVIEW | Denied | needs manhole construction permit-8th floor review - 5th floor permit. needs to permit on-site sewer with DEQ if over 3000 gal/day |
| 08/28/2006 | BETSY COTTLE | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 08/30/2006 | SUZANNE BOHNET | ENGINEERING | REVIEW | Denied | Building permit can be approved with approval of Site Plan. |
| 09/08/2006 | DAVID RIVERA | ZONING | REVIEW | Denied | 09/08/06 Development Services Department Zoning Review Section David Rivera Principal Planner Comments: 1. Zoning has reviewed the building plans but cannot approve them at this time until the approval ofth ehsite plan, landscape plans have been approved. 2. Zoning will re-review and approve the building plans on the next submittal provided the stamped and approved site plans are included with the building plan package and the building plans footprint and heights etc match the site plan concept and development criteria. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/22/2006 | GERARDO BONILLA | OUT TO CUSTOMER | Completed |