Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T06CM00826
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/15/2006 | SUZANNE BOHNET | ENGINEERING | REVIEW | Approved | |
02/15/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T06CM00826 2/15/06 1. Provide a lighting fixture schedule for all new lighting. 2. Demonstrate compliance with the 2003 IECC for this occupancy. 3. For the purpose of feeder load calculations track lighting shall be counted at 75VA/LF. Reference NEC220.12 (B). 4. Account for continuous load on panel schedule load calculations. 5. Provide service load calculations. 6. Clarify that this is an existing panel, if such is the case. 7. Data on the existing water heater does not appear to be correct. With 6240 VA, it would operate at 52A. This could not happen on a 40A circuit. 8. Demonstrate compliance with the Tucson Lighting Code. |
02/22/2006 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
02/23/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
02/23/2006 | DROBEY1 | BUILDING-COMMERCIAL | REVIEW | Needs Review | |
02/23/2006 | DROBEY1 | WWM | REVIEW | Needs Review | |
02/23/2006 | MARTIN BROWN | FIRE | REVIEW | Approved | |
02/23/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
02/23/2006 | ROBERT SHERRY | WATER | REVIEW | Approved |