Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T06CM00672
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/05/2006 | MARTIN BROWN | FIRE | REVIEW | Approved | |
05/17/2006 | GERRY KOZIOL | WWM | REVIEW | Denied | needs 8th floor credit evaluation, to resolve wastewater issues |
05/22/2006 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | CITY OF TUCSON DEVELOPMENT SERVICES STRUCTURAL REVIEW COMMENTS DATE: 5/23/06 ACTIVITY NUMBER: T06CM00672 PROJECT NAME: RESTROOM RENOVATION PROJECT ADDRESS: 301 S. PARK ARCHITECT / ENGINEER: MICHAEL BARONE PROJECT REVIEWER: CHRISTY FOREMAN TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1108 OR EMAIL AT CFOREMA1@TUCSONAZ.GOV IF YOU CARE TO DISCUSS. 1) Since restroom facilities are being completely demolished and built new both facilities must be fully compliant with ANSI A117.1 2003. Unisex facility does not provide compliance for Womens facility. Each restroom needs to be compliant. Provide building plan clarifying occupant load and fixture count per Chapt. 29, table 2902.1. 2) Dimension / locate horizontal grab bar. |
05/25/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1) Second request. Lavatory faucets shall be equipped with a mechanism that causes the faucet to close automatically after delivering no more than one-fourth gallon of water or shall be designed to deliver no more than an average of one-half gallon of water per minute at a pressure of eighty PSI. The maximum flow rates for plumbing fixtures shall be consistent with ARS Title 45, Chapter 1, Article 12. See text at: (http://www.azleg.state.az.us/ArizonaRevisedStatutes.asp). Reference Section 402.1, UPC 2003, as amended by the State of Arizona. 2) The third paragraph of Section 608.3, UPC 2003 requires the installation of a listed expansion tank or other device designed for thermal expansion control whenever the building water supply is prevented from expanding into the city water system due to a check valve or similar device. Revise the detail of the water heater installation to include the provision for thermal expansion control. Reference Section 608.3, UPC 2003. |