Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T06CM00227
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/23/2006 | MARTIN BROWN | FIRE | REVIEW | Denied | 1. No backflow preventor is required on the fire line. See ARS 41-2168. 2. Provide sprinkler design criteria on plans: Water supply Design standard Area of operation Design Density |
05/23/2006 | GERRY KOZIOL | WWM | REVIEW | Denied | NEEDS MANHOLE CONSTRUCTION PERMIT(8TH FLOOR REVIEW & 5TH FLOOR PERMIT) |
05/31/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. Demonstrate compliance with the Tucson Lighting Code, http://www.tucsonaz.gov/dsd/Codes___Ordinances/Tucson_Lighting_Code.pdf. For the purposes of demonstrating compliance, it needs to be very explicit on the plans whether or not a fixture is or is not full cutoff, and whether it is or is not installed under a canopy or overhang. 2. Submit catalogue cut sheets for all exterior lighting fixtures. 3. On Sheet E2.0, it appears that the circuit designation "A-14, 16" should read "B-14, 16." 4. Sheet R001 Note 42 refers being limited to low pressure sodium. This is in conflict with the Lighting Fixture Schedule on Sheet E0.0. 5. Panel B does not have adequate overcurrent protection. Reference NEC 408.16. |
06/06/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The applicable code for all commercial plumbing projects is the 2003 Uniform Plumbing Code with Local Amendments. The list of current building codes and the local amendments can be found at: http://www.ci.tucson.az.us/dsd/Codes___Ordinances/Building_Codes/building_codes.html 2. Coordinate the orientation of the building and the location of the water service entrance with the civil and architectural drawings. Reference Section 103.2.3, UPC 2003. 3. Provide information to show how the proposed water heater support is to be connected to the building structure. Reference Section 314.5, UPC 2003. 4. The branch pipe sizing chart shown on sheet P0.01 allows for water velocities greater than 10 feet per second. Limit the water velocity to less than 8 fps for the copper piping. Reference Section A 6.1, UPC 2003; IAPMO IS 3-2000, Section 610.0. Note that the Sloan Royal flush valve flows at approximately 25 gallons per minute during a flush cycle. 5. The 2-way cleanout shown in Detail 5/P0.01 is in violation of Section 707.6, UPC 2003. 6. Provide vent piping of sufficient size to comply with Section 904.1, UPC 2003. 7. If Section 1106.0, UPC 2003 was not used to size the roof drainage system, provide calculations to show how the roof drains and horizontal rainwater pipes were sized. Based on Section 1106.0, the effective area of the main roof is greater than 3009 square feet and should include the effect of side walls draining onto the roof and the contributory area of other roofs that drain onto the subject roof. In addition, if Section 1106.0 was used to size the roof drainage system, the roof drain and overflow are too small and any horizontal roof leaders are also too small. Reference Chapter 11 and Appendix D, UPC 2003. 8. Show the size of the roof drain and overflow fittings, as well as the size and termination of the roof leaders for the canopy roof. Reference Section 103.2.3, UPC 2003. |
06/07/2006 | ROBERT SHERRY | WATER | REVIEW | Approved | |
06/09/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. The applicable code for all commercial mechanical projects is the 2003 International Mechanical Code with Local Amendments. The list of current building codes and the local amendments can be found at: http://www.ci.tucson.az.us/dsd/Codes___Ordinances/Building_Codes/building_codes.html 2. Provide energy code compliance calculations for the building envelope. Reference Section 101.4, International Energy Conservation Code 2003. 3. Specify the minimum resistance (R-value) of the duct insulation to be used on this project. Reference Section 803.2.8, IECC 2003 and the Requirements Checklist (Section 4 of the Mechanical Compliance Certificate). 4. Clarify where keynote #21, sheet A101 ("1 hour fire rated room per TEP Standards") and, keynote #6, sheet A201 ("1 hour rated ceiling") occur. Reference Section 106.3.1, IMC 2003. 5. Revise the ventilation calculations to take into account the different occupancy types and occupancy loads in the building. Reference Sections 403.3 and 403.3.2, IMC 2003. 6. Provide information on the sequence of operation for the restroom exhaust to show that recirculation of the air from the restroom will not occur. Reference Section 403.2.1, IMC 2003. 7. Coordinate the termination point of the condensate drains with the plumbing design. |
06/14/2006 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Denied | COMPLY TO FIRE DEPARTMENT COMMENTS. |
06/30/2006 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | June 30, 2006 T06CM00227 and T06BU00072 Grading and Building Plan Review Loren Makus 1. The grading plan and building plan cannot be approved until the Development Plan has been approved. Include a copy of the approved Development Plan with the second submittal of the grading plan. 2. Provide a grading plan that provides a clear description of the proposed work. Clearly indicate by symbol and label the locations of pavement, proposed sidewalks and curbs. 3. Clarify the proposed improvements within the adjacent right-of-way. Clearly indicate the locations of the curbs and sidewalks to be installed as a part of this project. The Development Plan indicates that there will be a future curb location. If this location is proposed for this project, make it clear on the plans. If the future curb is to be installed at some later date, remove this from the grading plans. 4. Revise curb ramps to include truncated domes at all required location per the ADAAG. 5. Revise the retaining wall/screen wall detail to clarify that the retaining wall will be within the project property and not within the public right-of-way. Otherwise provide a letter from the Department of Transportation accepting the wall. 6. Clearly show how roof drainage and other concentrated flows will not be directed over sidewalks and pedestrian routes. |
07/20/2006 | HEATHER THRALL | ZONING | REVIEW | Denied | This building plan could not be reviewed by zoning at this time, as the development plan has not yet been approved. Once the development plan has been approved, D06-0006, Zoning will review the building plans over the counter to ensure the building plans match the approved development plan. To process review of this plan: please apply for a yellow site review card at the permit counter (this will allow the approved development plan to be converted to a site plan and placed in public records) and return to the zoning review counter. Once the development plan has been stamped as a site plan, those copies will need to be stapled in the building plans set. Staff will then review the building plans set to ensure the proposed structure will meet code requirements. Should you have any questions, contact me via email at Heather.Thrall@tucsonaz.gov or at 520-791-4541x1156. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/11/2006 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
10/11/2006 | SUE REEVES | REJECT SHELF | Completed |