Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T06CM00144
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/10/2006 | JOSE ORTIZ | ENGINEERING | REVIEW | Approved | |
01/10/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The current plumbing code is the 2003 UPC. 2. Show how the building drain and the waste branches are related to the relocated fixtures (i.e. a riser diagram) 3. The minimum flowing pressure for the Haws model 7612 eyewash is 30 PSI. Show how the existing water distribution system is able to accomodate this requirement.. 4. Show how the existing CW and HW piping is being modified. |
01/10/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
01/10/2006 | ROBERT SHERRY | WATER | REVIEW | Approved | |
01/10/2006 | PATRICIA GEHLEN | ZONING | REVIEW | Approved | |
01/10/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Provide outside air calculations and show the balancing information on the drawing. |
02/01/2006 | DROBEY1 | BUILDING-COMMERCIAL | REVIEW | Needs Review | 1) Provide a more complete floor plan. It appears existing corridor is being blocked. |
02/01/2006 | DROBEY1 | WWM | REVIEW | Needs Review | |
02/01/2006 | JIM EGAN | FIRE | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/01/2006 | DELMA ROBEY | APPROVAL SHELF | Completed |
02/01/2006 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
02/01/2006 | DELMA ROBEY | REJECT SHELF | Completed |