Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T06CM00099
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/17/2006 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 01/20/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the font size used on the drawings to a minimum of 1/8 inch, all uppercase. Reference Section 302.3, Uniform Administrative Code, 1997. 2. Specify the minimum resistance (R-value) of the duct insulation to be used on this project. Reference Section 803.2.8, IECC 2003. 3. Show the routing, and termination of the condensate drain. Reference Section 307.2, IMC 2003 and Section 807.2, UPC 2003 4. Provide a structural detail to show how the roof top unit is being supported. Reference Section 302.1, IMC 2003. 5. Provide guards for equipment located within 10 feet of a roof edge or of a walking surface that is elevated more than 30 inches above the adjoining grade. Reference Section 304.10, IMC 2003. 6. Provide a trap for the condensate per the manufacturer's recommendations. 7. Provide calculations demonstrating adequate ventilation. Reference Section 401.2, IMC 2003. 8. Show that a separation of at least ten feet exists between air intake openings and exhaust openings. Reference 401.5, IMC 2003. 9. Provide information on the sequence of operation for the restroom exhaust to show that recirculation of the air from the restroom will not occur. Reference Section 403.2.1, IMC 2003. 10. Ventilation for restrooms in public spaces requires a minimum of 75 CFM of mechanical exhaust per water closet or urinal. Reference Table 403.3, IMC 2003. 11. Show that the sizing of the A/C ducts results in an airflow system that can be supported by the fan of the rooftop unit. |
| 01/20/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide plumbing plans for the new work, including water isometrics and waste and vent isometrics. Reference Section 103.2.3, UPC 2003. 2. Provide a natural gas piping design, including the piping layout on a floor plan and a natural gas schematic showing the sizes, loads and developed lengths of the piping. Reference Section 103.2.3, UPC 2003. 3. Provide site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference Section 103.2.3, UPC 2003. 4. Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, recirculating pump and valves. Reference Sections 103.2.3, 605.5, and 608.3 UPC 2003. 5. Provide site drawing showing the size, route, and cleanouts of the building sewer. Reference Section 103.2.3, UPC 2003. |
| 01/23/2006 | BOB SUBA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | see attached plan review requirements. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/25/2006 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
| 01/25/2006 | SUE REEVES | REJECT SHELF | Completed |