Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T06CM00037
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/20/2006 | STANTEC | 2ND PARTY REVIEW | REVIEW | Denied | March 15, 2006 To: City of Tucson Development Services Department 201 N. Stone Avenue, First Floor Tucson, Arizona 85701 Attn: David Mann, P.E., Building Code Division Cc: Gaston Marchand, Architect 12 W. Sahuaro Vista1 Tucson, Arizona Re: Arreguin Guest House – New Structure City of Tucson No. T06CM00037 Stantec Project No. 816-30015-01 (076) Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter back-check time, we request that you please provide revised plans and calculations, clouding any changes, along with a written response to each of the noted items indicating the action taken. SCOPE OF REVIEW: The scope of this review covers Architectural, Structural, Plumbing, Mechanical, Model Energy and Electrical codes. All code references are to the 2003 International Residential Code (IRC). Applicants may reference the 2003 UPC for plumbing. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. GENERAL: There are no general comments to be addressed. ARCHITECTURAL: There are no architectural comments to be address. STRUCTURAL: The following previously made comment has not been addressed. Provide manufacturer’s calculations and data for pre-fabricated trusses upon next submittal. Truss calculations must be signed, dated and wet-sealed by an engineer who is registered in Arizona. Truss calculations shall be cross-referenced to the framing plan. The City of Tucson will allow a deferred submittal on trusses with an approved request letter signed by the building official. A letter has not been received from the building official accepting the deferral of the truss submittal. Please either provide this letter as previously requested, or provide the truss drawings for review. PLUMBING: There are no plumbing comments to be address. MECHANICAL: There are no mechanical comments to be address. ELECTRICAL: There are no electrical comments to be address. ENERGY: There are no energy comments to be address. -End of Review- If you have any questions, please call (520) 750-7474. Sincerely, Stantec Consulting Inc. Steven L. Nygren, R.A. Senior Plans Examiner SLN:sln |
| 03/22/2006 | GERRY KOZIOL | WWM | REVIEW | Denied | need to review location of connection to public sewer |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/24/2006 | ADRIANNE OLIVO | OUT TO CUSTOMER | Completed |
| 03/24/2006 | SUE REEVES | REJECT SHELF | Completed |