Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T06BU02446
Parcel: 136328110

Review Status: Completed

Review Details: GRADING

Permit Number - T06BU02446
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/12/2006 ANDREW CONNOR NPPO REVIEW Denied Include all of the following notes on the site/ grading plan: This site is subject to the provisions provided in the CITY OF TUCSON DEVELOPMENT STANDARD NO. 9-04.3.2.A & B HILLSIDE DEVELOPMENT SITE IMPROVEMENT

Vegetation Retention and Re-vegetation.

A. Vegetation Retention.

1. Existing trees with four (4) inch or greater trunk diameter and cacti will be preserved in their original locations, except for building sites and access and utilities serving building sites.

2. When retention of the above trees and cacti in their original locations is not possible due to building site location, the trees and cacti will be salvaged and replanted in areas requiring revegetation, whenever possible.

B. Re-vegetation. All cut or fill slopes, which are no steeper than three horizontal to one vertical (3:1) and all utility trenches or septic leaching fields which are not located in parking or driveway areas will be re-vegetated in compliance with the following requirements.

1. All plants used in revegetation must be the same as the native vegetation on the site or any adjacent site prior to grading or clearing.

2. Re-vegetation will be accomplished with the following minimum requirements for plants.

a. Desert trees, a minimum of fifteen (15) gallon size with a minimum trunk diameter of two (2) inches measured at the soil level, or large specimen cactus will be placed at the same vegetation density found on the site prior to any clearing, grubbing, or grading.

b. Seeds for trees, desert shrubs, and grasses will be planted with a density adequate to control erosion and may use one of the following methods of planting or any other method approved by the Zoning Review Section at DSD.

· Raked into the soil with appropriate mulch materials;
· Hydro-seeding;
· Anchored mulches; or
· Established on jute, rolled straw, or similar material.

3. A temporary watering system must be installed until the re-vegetation materials are established.

4. Fencing shall be required during construction per DS 2-06.8.0 Fig.1 for all undisturbed natural desert areas of Protected Native Plants and for individual Protected Native Plants to be preserved-in-place. The area to be fenced shall be beyond the "drip-line" of the vegetation by one-half (½) the distance of the "drip-line" radius. For Saguaros and cacti, the area to be fenced shall be equal to the distance of one-half (½) the height of the plant per DS 2-15.6.0.

5. NPPO pre permit inspection is required prior to grading inspection can be scheduled by calling IVR system and entering inspection code 09015 or calling Landscape Field Representative directly @ 791-5550 EXT 1140
11/07/2006 STEVE SHIELDS ZONING REVIEW Denied DSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Loffredo Residence
T06BU02446
Grading Plan (1st Review)

TRANSMITTAL DATE: November 08, 2006

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the grading plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next grading plan submittal.

3. Zoning will re-review the grading plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.org or (520) 791-5608 ext. 1180.

C:\planning\grading\t06bu02446.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Approved site plan and additional requested documents
11/30/2006 PAUL MACHADO ENGINEERING REVIEW Approved Comments to be posted on 12-04-06, PM

Final Status

Task End Date Reviewer's Name Type of Review Description
12/11/2006 CINDY AGUILAR OUT TO CUSTOMER Completed
12/11/2006 SUE REEVES REJECT SHELF Completed