Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T06BU02199
Review Name: GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/11/2006 | ANDREW CONNOR | NPPO | REVIEW | Denied | Submit a copy of the approved site plan including landscape plan for reference. The grading application will be reviewed for compliance only when the approved documents are included in the submittal. Revise grading plans as necessary to comply with the approved site plan. |
| 10/02/2006 | DAVID RIVERA | ZONING | REVIEW | Denied | 10/02/06 Development Services Department Zoning Review Section David Rivera Principal Planner Comments: 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the grading plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next grading plan submittal. 3. Zoning will re-review the grading plan on the next submittal to ensure compliance with the approved and stamped site plan. Additional comments may be forthcoming. 4. The sidewalk along the north side of the building has not been drawn at six and one-half feet in width as required. See the site plan for comparison. For consistency, please ensure that all changes that are made to the site plan are incoporated into the grading plan. |
| 10/06/2006 | PAUL MACHADO | ENGINEERING | REVIEW | Denied | To: Jeff Stanley, P.E. DATE: October 6, 2006 Stanley Engineering And Drainage P.O. Box 1888 Tucson, Arizona 85702 SUBJECT: Old Pueblo Gymnastic Academy Grading Plan T06BU02199 (First Review) T14S, R15E, Section 28 RESUBMITTAL REQUIRED: Grading Plan and SWPPP. The Grading Plan (GP) and Stormwater Pollution Prevention Plan cannot be approved as submitted. Please address the following review comments prior to the next submittal. Grading Plan: 1. Please include a response letter to the comments along with the corrected copies of the GP. 2. Please show a typical cross section of the P.A.A.L. or call out the percentage of slopes. Call out the GB at the D/W, if applicable. 3. Add note: "Depress all landscaped areas a maximum of 6" for water harvesting" 4. List administrative address/site address on plans. 5. List GP number (T06BU02199) on each sheet. 6. Please show the proposed roof drainage patterns, 100% of the 10-year flow must be conveyed under the sidewalks. Please provide supporting calculations to demonstrate compliance with D.S. 3-01.4.4. If the location(s) of the roof scuppers have not yet been decided, add a general note indicating sidewalk scuppers (per COT/SD) will be used when the roof scuppers locations have been designed. 7. Call out surface paving material. 8. A permit or a private improvement agreement will be necessary for any work performed within the Right-of-way. Contact Permits and Codes at (520) 791-5100 for permit information. 9. Drainage patterns with percent slopes (Show patterns within the first 100 feet from the property line). 10. Call out peak discharges entering and exiting the site. Drainage report: 1. The DR has been accepted by engineering. Stormwater pollution prevention plan: 1. Reports and Other Information: All NOTs, SWPPPs, reports, certifications, or information required by this general permit and other information requested by the ADEQ or authorized representative of the ADEQ shall be signed by a person described in Part VI.K.1 or by a duly authorized representative of that person. A person is a duly authorized representative only if: 2. Certification. Any person signing a documents under the terms of this permit shall make the following certification: I certify under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. If you have any questions, I can be reached at 791-5550 x1193 or Paul.Machado@tucsonaz.gov Paul P. Machado Senior Engineering Associate City of Tucson/Development Services Department 201 N. Stone Avenue P.O. Box 27210 Tucson, Arizona 85726-7210 (520) 791-5550 x1193 office (520) 879-8010 fax C:/7670 E Wrightstown Rd. Grad. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/09/2006 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
| 10/09/2006 | SUE REEVES | REJECT SHELF | Completed |