Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T06BU01651
Parcel: 120052720

Review Status: Completed

Review Details: RESUBMITTAL - GRADING

Permit Number - T06BU01651
Review Name: RESUBMITTAL - GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/30/2007 JASON GREEN ENGINEERING REVIEW Approved DATE: July 30, 2007
SUBJECT: Fry's Fuel Facility Grading Plan- 2nd ngineering Review
TO: Metro Permits Attn: Lisa Bowers
LOCATION: 904 W Irvington Road, T14S R13E Section 35 Ward 1
REVIEWERS: Jason Green, CFM
ACTIVITY: T06BU01651


SUMMARY: Engineering Division of Development Services Department has received the proposed grading plan, landscape plan, Drainage Report (O'Neill Engineering, Inv., 19JUL02 revised 14DEC06, 05APR07 and 06JUL07) and Stormwater Pollution Prevention Plan (O'Neill Engineering, Inv., 09JUL07). Engineering Division has reviewed the submitted grading plan and SWPPP and recommends approval of the grading plan at this time.


1) Approval from TDOT Permits and Codes for all improvements within the public right-of-way will be required. A right-of-way use permit application will be required prior to construction.

2) Call for a Pre-construction meeting prior to start of earthwork. To schedule a DSD Pre-construction meeting, SWPPP inspection or general Engineering Inspections, call IVR (740-6970), or schedule with a Customer Service Representative at the Development Services Department, or contact DSD Engineering at 791-5550 extension 2101, or schedule inspections online at:

http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html

3) DS Sec.11-01.4.1.C.4: All retaining walls will require a separate permit for review and approval by all necessary Development Services Departments.



If you have any questions call me at (520) 837-4929.


Jason Green, CFM
Senior Engineer Associate
Engineering Division
Development Services
07/30/2007 ANDREW CONNOR NPPO REVIEW Denied 1. Submit a copy of the COT approved development plan including landscape plan for reference. The grading application will be reviewed for compliance only when the approved documents are included in the submittal. Revise grading plans as necessary to comply with the approved development plan.

2. The development plan must have a site card with DSD stamps and approvals from the appropriate divisions before the grading plan can be reviewed.
08/13/2007 DAVID RIVERA ZONING REVIEW Denied 08/13/07

Development Services Department
Zoning Review Section

David Rivera
Principal Planner

Comments:

1. The grading plan has been reviewed by Zoning Review Section but cannot approve at this time. Comment four has not been completed or addressed. For more information on the process related to comment four, contact Michael St. Paul or David Rivera. The grading plan can be reiviewed over the counter with an appointment. Please call and make an appointment if you wish to have the Zoning Reviewer review the plan over the counter and approve if possible. ( Comment four has been mentioned as a requirement as of the first review.)

2. Zoning could not verify that the grading plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped development, landscape, and NPPO plans with the next grading plan submittal.

3. Zoning will re-review the grading plan on the next submittal to ensure compliance with the approved site/development plan. Additional comments may be forthcoming.

4. A site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the grading plan can be approved by Zoning. Two copies of the approved development plan, landscape and NPPO plans are to be submitted with the grading plans packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The development plan may be walked through for stamps and site card sign off. Submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the grading plans packet processed together for site approval.

Final Status

Task End Date Reviewer's Name Type of Review Description
08/20/2007 CINDY AGUILAR OUT TO CUSTOMER Completed
08/20/2007 SUE REEVES REJECT SHELF Completed